Preview REPORT INDICATING STATUS OF CONSTRUCTION OF TRANSMISSION LINES (220 kV & ABOVE)

REPORT INDICATING STATUS OF CONSTRUCTION OF TRANSMISSION LINES (220 kV & ABOVE) VIS-A-VIS PROGRAMME DURING 2015-2016 As on 30-SEP-2015 Construction progress Status Target Date Name of Ckts Total Towers Sl (S/C) Voltage Lengt Transmission Remark No & Level h TL STC TE STG Revised/ Lines (D/C) cKM (Nos) (Nos) (Nos) (cKM) Schedule Anticipate d 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. DAMODAR VALLEY CORPORATION (DVC) 1 Gola - Ranchi (PG) D/C 220 112 216 145 91 0 NOV-14 SEP-15 Railway Crossing:SER, Ranchi approved in principle for 3 no.rail crossing on 24.11.2014. Demand note raised by SER has been paid. SER being persued for agreement in this respect.PTCC: proposal submitted to concerned authority on 27.8.14. Matter is being persued with H'bag, BSNL & Ranchi, BSNL. Forest Clearance: Working Clearance issued on 22.5.2015. Progress affected due to non-availability of tower materials. In order to solve fund crisis faced by Contractor (M/s ECI-SEW), approval has been arranged for payment to the sub-vendor directly & subsequently 234 MT of tower materials has been delivered at site. 2 Kodarma-Giridih D/C 220 212 324 324 324 212 FEB-10 AUG-15 Commissioned 08/15. 3 LILO of Mejia-Kalyaneswari at Burnpur S/S D/C 220 37 79 55 0 0 DEC-15 Severe ROW problem in 17 no locations. SE Railway has given in principle clearance of crossing. Around 24 no. locations outside the ISP premises are being diverted again due to severe ROW problem. Contractual issues cropped up due to repeated route diversion. Presently work is held up. 4 Mejia TPS - Gola D/C 220 342 552 541 509 148 DEC-08 SEP-15 Forest: Working clearance obtained on 6.3.2013 from GOJ. Contractual issues cropped up due to delay in obtaining forest clearance as well as theft of materials (100 Ckm.) from erected line. Rectification work of the theft portion of the line has been completed. 54 km (i.e 108 ckm) of line charged at 220 KV from MTPS end on 09.9.15. 5 Raghunathpur TPS -Ranchi (PG) D/C 400 311 439 439 431 274 AUG-10 MAR-15 Forest: Working clearance obtained in January 2013.PTCC clearance:issued on 18.2.14. Aviation clearance: Obtained. Slow progress due to non-availability of working gang due to fund crunch of Contractor (M/s Jyoti Structures). Approval has been arranged for payment to the sub-vendor directly to solve above fund crisis of M/s JSL which has subsequently resumed work in Sep 2015 for the balance portion. Legends TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 1 of 122 Construction progress Status Target Date Name of Ckts Total Towers Sl (S/C) Voltage Lengt Transmission Remark No & Level h TL STC TE STG Revised/ Lines (D/C) cKM (Nos) (Nos) (Nos) (cKM) Schedule Anticipate d 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. NTPC LIMITED. (NTPC Ltd.) 1 LILO of Satna - Gwalior at Barethi TPS D/C 765 . 2 Lara-I TPS - Raigarh Pooling Station (Kotra) D/C 765 . Legends TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 2 of 122 Construction progress Status Target Date Name of Ckts Total Towers Sl (S/C) Voltage Lengt Transmission Remark No & Level h TL STC TE STG Revised/ Lines (D/C) cKM (Nos) (Nos) (Nos) (cKM) Schedule Anticipate d 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. POWER GRID CORPORATION OF INDIA LIMITED (PGCIL) 1 +/- 800KV HVDC Biswanath Chariyali - Agra Bi-pole BIPOL ±800 3506 4369 4369 4369 3506 AUG-13 SEP-15 Ready for commissioning 09/15. line E 2 400 kV D/C trans. Line for swapping of Kahalgaon #1 D/C 400 20 38 38 38 20 APR-15 APR-15 Commissioned 04/15. bay with Sasaram# 1 bay at Biharshariff S/Stn. 3 Allahabad - Kanpur line D/C 400 486 629 370 192 JUN-16 JUN-16 Work under progress. 4 Alusteng(Srinagar) - Drass S/C 220 120 0 0 0 0 MAR-16 . 5 Angul - Dhenkanal D/C 765 6 Angul - Jharsauguda line D/C 765 570 792 592 240 44 DEC-15 JUN-16 ROW being faced. Hug forest involvement clearance awaited. Critical 7 Angul Pooling Station - Jharsuguda Pooling Station S/C 765 270 510 510 507 252 MAR-13 NOV-15 Forest clearance received in May'14. Severe ROW in 32Loc/50Km at Angul end. line-II Work being executed with police protection. 8 Aurangabad (PG) - Padghe (PG) D/C 765 570 772 636 595 142 AUG-14 SEP-16 Forest clearance awaited.Critical 9 Aurangabad - Boisar line D/C 400 654 896 666 561 300 JUL-14 JUN-16 Stage-I Forest clearance (138ha.) received in Aug'15. Severe ROW problem (involvement grape garden). 10 Aurangabad - III - Aurangabad (PG) 2xS/C 765 11 Aurangabad - Solapur line D/C 765 556 760 760 760 556 MAR-16 SEP-15 Commissioned 09/15. 12 Bairasuil HEP - Sarna D/C 220 80 Work yet to stared. 13 Balia - Varanasi S/C 765 165 463 463 463 164 AUG-14 OCT-15 Completion matching with varansai S/stn. 14 Balipara - Biswanath Chariyali D/C 400 114 165 165 165 114 AUG-13 SEP-15 Commissioned 09/15. 15 Bareilly - Kashipur line (Quad) D/C 400 202 282 282 282 202 APR-13 APR-15 Commissioned 04/15. 16 Barh-II - Gorakhpur D/C 400 698 944 944 944 698 AUG-14 MAY-15 Commissioned 05/15. 17 Betul - Khandwa (Quad) line D/C 400 338 440 287 188 32 MAY-16 MAY-16 Work under progress. 18 Bhiwani - Hissar line D/C 400 116 159 159 159 101 MAR-16 OCT-15 06 ckm stringing held up due to severe ROW problem at Bhiwani end. 19 Biharshariff - Sasaram line D/C 400 133 344 344 317 158 DEC-15 Completion matching with Varanasi Sub station. 20 Bypassing of Bhatapara - Raipur as Bhatapara - Bhilai S/C 400 2 4 NOV-11 OCT-13 21 Champa Pooling Station - Kurukshetra (HVDC) BIPOL ±800 2573 3474 3341 1790 655 JUN-15 JUN-16 Completion matching with Champa HVDC Station. Efforts being made for Pole-I E in Mar'16. Stage-I forest clearance for WR-II portion awaited. 22 Dehradun - Abdullapur D/C 400 144 247 211 199 44 NOV-14 JUN-16 Severe ROW problem in Uttrakhand. Legends TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 3 of 122 Construction progress Status Target Date Name of Ckts Total Towers Sl (S/C) Voltage Lengt Transmission Remark No & Level h TL STC TE STG Revised/ Lines (D/C) cKM (Nos) (Nos) (Nos) (cKM) Schedule Anticipate d 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 23 Dehradun - Bagpat D/C 400 249 443 409 386 95 NOV-11 JUN-16 Severe ROW problem in western UP. 24 Dharamjaygarh - Jabalpur Pooling Station line D/C 765 848 1138 1138 1138 848 MAR-13 SEP-15 Ready for Commissioning 09/15. 25 Dharmapuri (Salem New) - Somanahalli D/C 400 244 336 310 265 171 AUG-14 DEC-15 Severe ROW problem faced in Karnataka. Critical 26 Drass - Kargil S/C 220 60 MAR-16 27 Dulhasti - Kishenpur D/C 400 242 340 299 263 58 NOV-14 JUN-16 Implementation affecetd due to delay in forest clearance(received in Feb'15). 28 Durgapur-Jamshedpur (Balance Portion) D/C 400 314 434 434 434 314 JUL-13 Aportion of line (279 Ckm) commissioned in April'12. balance portion under hold due to ECL. 29 Edamon (KSEB) - Muvattupuzha (PG) D/C 400 297 438 159 105 29 NOV-08 DEC-16 Completion uncertain due to severe ROW problem. Work to start after assesment of compensation & payment by stateGovt./KSEB. Revised G.O. with enhansed compensation issued in Jan'15.Recently G.O. issued on 30.07.15 in which compensation to be done on land value, to be finalised by concern DC. 30 Essar Gujarat TPS - Bachau D/C 400 450 605 595 590 410 FEB-14 DEC-15 Severe ROW problem being encountered. 31 Ext. of one ckt Biharshariff - Sasaram at Varanasi (Q) D/C 400 251 344 344 317 158 MAY-15 DEC-15 Completion matching with Varansai S/stn. 32 Gaya - Varanasi S/C 765 246 738 729 712 221 AUG-14 DEC-15 Completion matching with S/stn. Varansi sub station critical due to delay in land acquisation.ROW (Naxalite)problem faced. 33 Gola - Ranchi line D/C 220 112 34 Gooty - Madhugiri D/C 400 418 575 572 572 370 JUN-14 NOV-15 Down strem system being execution by State not available. 35 Gwalior - Jaipur (Ckt 1) S/C 765 305 834 834 834 305 MAR-14 AUG-15 Commissioned 08/15. 36 Gwalior - Jaipur line (Ckt 2) S/C 765 311 656 656 656 311 MAR-14 AUG-15 Commissioned 08/15. 37 Jabalpur PS - Orai D/C 765 838 2095 55 APR-18 APR-18 Work under progress. 38 Jaipur (RVPNL) - Bhiwani (IInd Ckt) line S/C 765 277 741 585 266 55 MAR-16 MAR-16 ROW problem on 12 nos. location at Bhiwani end. 39 Jaipur - Bhiwani line S/C 765 272 741 741 741 272 MAR-16 AUG-15 Commissioned 08/15. 40 Jharkhand Pool - Gaya (Quad) line D/C 400 372 332 305 217 NOV-13 DEC-15 Stage-I forest clearance received in Dec'14 & permission to work received in May'15. 41 Jharsuguda - Dharamjaygarh line D/C 765 312 296 237 110 10 DEC-15 JUN-16 Huge forest involvement.Critica 42 Kakrapar APP - Navsari line D/C 400 76 108 83 52 OCT-16 OCT-16 work under progress. 43 Kakrapar APP - Vapi line D/C 400 208 289 275 22 OCT-16 OCT-16 Work under progress. Legends TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 4 of 122 Construction progress Status Target Date Name of Ckts Total Towers Sl (S/C) Voltage Lengt Transmission Remark No & Level h TL STC TE STG Revised/ Lines (D/C) cKM (Nos) (Nos) (Nos) (cKM) Schedule Anticipate d 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 44 Kameng - Balipara D/C 400 110 149 136 102 0 AUG-13 DEC-16 ATS slowed-down to the extent possible to match with Gen. of Kameng. Gen. proj. delayed. (expected in 2016-17). 45 Kanpur (new) - Kanpur (exit) D/C 400 41 62 62 62 38 OCT-14 MAR-16 Matching with Kanpur 765KV GIS. 46 Kanpur - Jhatikara S/C 765 483 1265 1265 886 320 OCT-14 JUN-16 Matching with Kanpur 765KV GIS. 47 Kargil-Khalsti S/C 220 90 MAR-16 48 Kashipur - Roorkee line S/C 400 302 419 420 418 282 APR-13 OCT-15 Severe ROW problem in Roorkee end. 49 Khalsti - Leh S/C 220 74 MAR-16 50 Khamam - Nagarjunasagar line (Vzag TCL) D/C 400 292 388 340 273 108 AUG-16 DEC-15 work under progress. 51 Khandwa - Indore line D/C 400 360 490 428 235 190 MAY-16 MAY-16 Work under progress. 52 Khargone TPP-Indore D/C 400 DEC-15 53 Kishanganga - Amargarh D/C 220 206 515 MAR-18 JUL-17 Award for tower pkgs. placed in march 2015. Engg. & survey under progress. 54 Kishanganga - Wagoora D/C 220 78 78 MAR-18 MAR-18 Award for tower pkgs. placed in march 2015. Engg. & survey under progress. 55 Kishanganj - Patna line (Quad) D/C 400 692 915 914 914 658 NOV-13 NOV-15 Completion matching with Kishanganj s/stn. Land acquired in Aug'13. 56 Kishenpur - New Wanpoh line (132 KM D/C + 7 KM MC+D/ 400 278 394 386 342 173 JUL-13 JUN-16 Final forest clearance to be issu after cabinit meeting. Limited working period Multi Ckt) C due to snow-bound area affecting implementation. Critical 57 Kishenpur - Ratle, (Dulhasti- Kishenpur Second Ckt S/C 400 stringing extending up to Ratle HP) 58 Krishnapatnam UMPP - Gooty line (Quad) D/C 400 632 788 788 788 578 MAR-13 400KV D/C Nellor-Gooty line commissioned in Mar'13. (early K'patnam UMPP - Gooty line) 59 Kurnool (New) - Raichur line D/C 765 119 319 318 175 85 AUG-16 MAR-16 Work under progress. 60 Kurukshetra - Jallandhar D/C 400 516 728 728 646 455 JUN-15 DEC-15 Completion matching withreadiness of LILO of Abdullapur - Sonepat at Kurukshetra. 61 Kurukshetra - Jind line (Q) D/C 400 190 270 5 MAR-18 MAR-18 Work under progress. 62 LILO of Aurangabad - Pune at Pune D/C 400 97 67 62 51 23 OCT-14 NOV-15 Severe ROW problem. Critical. 63 LILO of One Ckt Parbati Pooling Station - Amritsar at D/C 400 17 42 JUL-17 JUL-17 Award placed in May'15. Jalandhar 64 LILO of One Ckt of Baripada - Mendhasal line at Dubri D/C 400 32 48 48 48 32 NOV-12 JUL-15 Commissioned 07/15. (OPTCL) 65 LILO of 2nd ckt of Neyveli - Trichy at Nagapattnam D/C 400 46 65 65 65 46 JUL-15 AUG-15 Ready for Commissioning 08/15. Legends TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 5 of 122 Construction progress Status Target Date Name of Ckts Total Towers Sl (S/C) Voltage Lengt Transmission Remark No & Level h TL STC TE STG Revised/ Lines (D/C) cKM (Nos) (Nos) (Nos) (cKM) Schedule Anticipate d 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 66 LILO of Abdullapur - Sonepat at Kurukshetra (Tripal) D/C 400 30 45 45 45 8 JUN-15 DEC-15 Completion matching with Kurukshetra AC Sub station. 67 LILO of Agra - Bharatpur at Agra S/C 220 120 300 JUL-17 JUL-17 Award placed in Mar'15. 68 LILO of Agra - Meerut at Aligarh D/C 765 87 APR-18 APR-18 Award placed in Mar'15.Engg. & survey under progress. 69 LILO of Aizwol (PG) - Zemabawk at Melriat (PG) D/C 132 30 45 0 0 0 DEC-12 JUN-16 Package under re-tendering. 70 LILO of Baripada - Mendhasal at Pindiabil D/C 400 54 106 90 62 8 DEC-15 Completion matching with Sub station. Severe ROW problem being faced. 71 LILO of Birpara - Salakati at Alipurduar D/C 220 8 JAN-15 SEP-15 Scpoe deleted. 72 LILO of Bishwanath Chariali - Agra at Alipurduar HVDC ±800 24 36 19 6 JAN-15 DEC-16 Gen. Project delayed (ant. in 2016-17). Work under progress. 73 LILO of Bongaigaon - Siliguri at Alipurduar D/C 400 13 23 11 4 JAN-15 DEC-16 Work under progress. 74 LILO of Both Ckt of Bawana - Mandola at Rajgarh D/C 400 MAY-17 MAY-17 Award under progress. 75 LILO of Both Ckt of Dehradun - Bagpat line (QUAD) at D/C 400 58 78 35 0 0 NOV-12 MAR-16 Severe ROW problem in western UP.Line proposed for deletion as advised by Saharanpur State Govt. (reffered to CEA). Completion Uncertain 76 LILO of Dadri - Malerkotla at Kaithal D/C 400 50 67 6 JUN-16 JUN-16 Work under progress. 77 LILO of Dehar - Bhiwani at Rajpura (PSTCL) S/C 400 29 43 43 43 29 AUG-14 JUL-15 Commissioned 07/15. 78 LILO of Gangtok - Melli at Rangpo S/C 132 19 34 Award placed in Aug/11. Engg. in progress. 79 LILO of Gangtok - Rangit at Rangpo S/C 132 7 21 21 21 7 NOV-14 NOV-14 Commissioned 11/14. 80 LILO of Gaya - Fatehpur at Varanasi line S/C 765 7 9 9 9 6 MAY-15 DEC-15 Commissioning matching with S/stn. 81 LILO of Gazuwaka - Vijayawada at Vemagiri D/C 400 38 95 JUN-14 JUN-16 Scheme under review in view of CERC direction.LILO line canelled in schemen & added another scheme. 82 LILO of Hyderabad - Kurnool at Maheshwaram D/C 400 0 MAR-18 MAR-18 Award placed in Mar'15.Engg. & survey in progress. 83 LILO of Jiribam - Aizawl at Turial D/C 132 84 LILO of Kadapa (Cuddapah) - Kolar at Kunta Pooling D/C 400 30 10 MAY-16 Work under progress. Station 85 LILO of Kanpur - Jhatikara at Aligarh D/C 765 87 APR-18 APR-18 Award placed in Mar'15.Engg. & survey under progress. 86 LILO of Loktak - Imphal at Imphal (New) line D/C 132 1 5 5 5 1 DEC-12 MAR-13 Commissioned 03/13. 87 LILO of Lonikhand (MSETCL)- Kalwa at Navi Mumbai D/C 400 18 25 25 23 14 SEP-10 DEC-15 Balance protion of line using under ground cable. Award placed in Sep'13.ROW problem for laying of cable continue. Critical 88 LILO of Meerut - Kaithal at Bagpat D/C 400 124 177 175 162 71 FEB-12 MAR-16 Completion matching with Bagpat S/Stn. (delay in land acquisation). Severe ROW problem. 89 LILO of Moga - Bhiwani at Hissar line D/C 400 4 4 4 4 4 MAR-16 JUN-15 Commissioned 06/15. Legends TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 6 of 122 Construction progress Status Target Date Name of Ckts Total Towers Sl (S/C) Voltage Lengt Transmission Remark No & Level h TL STC TE STG Revised/ Lines (D/C) cKM (Nos) (Nos) (Nos) (cKM) Schedule Anticipate d 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 90 LILO of Neelamangla - Hoddy line and LILO of D/C 400 34 25 25 25 25 JUL-12 DEC-15 Completion uncertain. Somanhally - Hoddy at Yelahanka ROW problem. Critical.Petition filed in Karnataka High Court for now resolved on 31.07.13. Work commenced in Jan'14. However work again stopped due to agitation. 91 LILO of One Ckt of Bamnoli - Jhattikara at Dwarka-I D/C 400 MAY-17 MAY-17 Award under progress. 92 LILO of Rajarhat - Purnea at Gokarana D/C 400 906 1341 633 242 12 APR-16 APR-16 work under progress. 93 LILO of Ranganadi - Balipara 400KV D/C line at D/C 400 52 77 77 75 46 AUG-13 OCT-15 ROW problem. Completion matching with HVDC link. Biswanath Chariyali (Pooling Point) 94 LILO of Sarna - Hiranagar at Samba S/C 220 34 85 JUL-17 JUL-17 Award placed in Mar'15.Engg. & survey under progress. 95 LILO of Sasaram - Allabhadad at Varanasi (Q) D/C 400 237 351 342 275 80 OCT-14 MAR-16 Completion matching with Varansai S/stn. 96 LILO of Siliguri (Existing) - Purnea at Kishanganj D/C 400 8 25 25 25 6 JAN-13 NOV-15 Completion matching with kishenganj S/S. 97 LILO of Siliguri - Dalkhola line at New Pooling Station D/C 220 36 69 69 64 25 JAN-13 NOV-15 Completion matching with Kishenganj S/S. Kishanganj 98 LILO of Somanhally - Hoddy line at Yelahanka D/C 400 25 25 25 25 25 DEC-15 JUN-16 ROW problem. Critical.State Govt. help required for resolution of compensation issue. 99 LILO of Subhashgram - Jeerat at Rajarhat S/C 400 8 16 5 APR-16 APR-16 Work under progress. 100 LILO of Teesta-III - Kishanganj 400 KV D/C (Q) at MC+D/ 400 41 84 11 9 1 NOV-13 DEC-15 Works was held up. Severe ROW problem issue.Now started. Construction of 01 Rangpo (21 D/C+1.5 M/C) C LILO deferred. 101 LILO of Tilaiya - Balia line at Gaya D/C 765 DEC-16 102 LILO of Vishnu Prayag - Muzaffarnagar at Tapovan D/C 400 MAR-15 Investment approval pending. Vishnugarh HEP 103 LILO of boht ckt RAPP - Kankroli at Chittorgarh D/C 400 48 54 JUN-16 JUN-16 Award placed in May'14 LILO only one ckt is to be carried out scheme has been revised. 104 LILO of both ckt of Kolhapur - Mapusa at Kolhapur D/C 400 172 120 120 120 80 APR-15 OCT-15 Completion matching with Sub station. (new) 105 LILO of one circuit of Dulhasti - Kishenpur at Ratle D/C 400 . HEP. 106 LILO of one ckt Rengali - Baripada at Dubri (OPTCL) D/C 400 34 48 48 48 32 NOV-12 AUG-15 Line commissioned in Aug'15. 107 LILO of one ckt of Satna - Gwalior at Orai D/C 765 160 APR-18 APR-18 Award placed in Mar'15.Engg. & survey under progress. 108 Lara STPS - Champa pooling Station line (Q) D/C 400 224 307 14 APR-17 APR-17 Work under progress. 109 Lara STPS - Raigarh (Kotra) line D/C 400 36 50 20 2 APR-17 DEC-15 Work under progress. Legends TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 7 of 122 Construction progress Status Target Date Name of Ckts Total Towers Sl (S/C) Voltage Lengt Transmission Remark No & Level h TL STC TE STG Revised/ Lines (D/C) cKM (Nos) (Nos) (Nos) (cKM) Schedule Anticipate d 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 110 Lower Subhansiri - Biswanath Chariyali line -I D/C 400 334 444 329 228 64 AUG-13 MAR-16 Completion uncertain. Works stand still on a/c of localm disturbance /agitation against big dam. Generation uncertain. 111 Lower Subhansiri - Biswanath Chariyali line -II D/C 400 340 465 327 196 35 AUG-13 MAR-16 Completion uncertaion.Works stand still on a/c of local disturbancec /agitation against big dam. Gen. schedule uncertain. 112 Lucknow - Kanpur D/C 400 320 454 25 3 JUN-16 JUN-16 Work under progress. 113 Madhugiri - Yelhanka D/C 400 122 177 131 100 JUN-14 JUN-16 Completion uncertain due to severe ROW problem in Karnataka. Critical. 114 Mariani (New) - Mokikchung (PG) D/C 220 97 163 163 163 97 DEC-12 JUN-15 Ready for Commissioning 06/15. 115 Mauda-II - Betul (Quad) line D/C 400 386 537 403 200 35 MAY-16 MAY-16 Work under progress. 116 Meerut - Moga line S/C 765 337 922 922 922 337 MAR-15 MAY-15 Commissioned 05/15. 117 Meja - Allahabad line D/C 400 56 81 77 29 5 JUL-15 JUN-16 Work slowed down to the extent feasible matching with Generation project. 118 Melriat (New) - Sihmui line D/C 132 12 30 0 0 0 DEC-12 JUN-16 Stage-I forest clearance awaited.package under re-tendering. 119 Mokokchung (PG) - Mokokchung (Nagaland) line D/C 132 2 11 11 11 2 DEC-12 JUL-15 Line commissioned in Jul'15. 120 Mysore - Kozhikode D/C 400 420 614 614 614 420 DEC-07 SEP-15 Ready for Commissioning 09/15. 121 NCC gen Sw Yd. - Nellore PS line (Q) D/C 400 33 95 95 79 2 FEB-17 MAR-16 Work undee progress. 122 Nagapattinam Pooling Station - Salem (NMTCL) D/C 765 534 543 386 154 36 MAR-15 DEC-15 Work under progress. 123 Narendra (New, Kudgi) - Kolhapur (new) D/C 765 376 489 489 489 369 APR-15 OCT-15 Completion matching with Kudgi S/stn. 124 Narendra (New, Kudgi) - Narendra (Existing) D/C 400 354 464 464 455 332 APR-15 SEP-15 Completion matching with Kudgi S/stn. Efforts being made to complete earlier. 125 Navsari - Boisor D/C 400 432 575 480 447 287 OCT-12 MAR-16 Line is now proposed to be terminated at Boisor S/Stn in place of Mumbai new loc. Forest clearance awaited.Contigrncy arrangement to connect Navsari-Boisar with Vapi-Navi Mumbai line by passing forest area to form Vapi-Navsari line (212 Ckm) commissioned in Mar'13.FC proposal submitted to MoEF on 28.07.14 (57 Hac.) 126 Nizamabad - Dichpali D/C 400 22 55 MAY-18 MAY-18 Award placed in Mar'15. Engg. & survey under progress. 127 Nizamabad - Dichpali line D/C 400 22 55 MAY-18 MAY-18 Award placed in Mar'15.Engg. & survey under progress. 128 Orai - Aligarh D/C 765 600 1500 APR-18 APR-18 Award Placed in Mar'15.Engg. & survey under progress. 129 Orai - Orai (Q) D/C 400 76 190 APR-18 APR-18 Award placed in Mar'15.Engg. in progress. 130 Padghe (PG) - Kudus line D/C 400 34 46 44 42 19 AUG-14 SEP-16 Commissioning of Kuddus S/S/by MSETCL critical. Completion matching Legends TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 8 of 122 Construction progress Status Target Date Name of Ckts Total Towers Sl (S/C) Voltage Lengt Transmission Remark No & Level h TL STC TE STG Revised/ Lines (D/C) cKM (Nos) (Nos) (Nos) (cKM) Schedule Anticipate d 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. with Aurangabad-Padghe line. 131 Padghe (PG) - Padhe (PG) D/C 400 50 46 44 42 19 AUG-14 SEP-16 Completion of Kudus S/S by MSETCL critical.Completion matching Aurangabad - Padghe line. 132 Panchkula - Patiala D/C 400 131 177 157 62 4 JUN-16 JUN-16 Work under progress. 133 Pasighat - Roing line. S/C on 132 70 346 344 344 100 DEC-12 OCT-15 Readiness of UP & down stream system being implementated by Arunachal D/C Pradesh Govt. Critical for commissioning of line. 134 Pipalkoti HEP - Pipalkoti (THDC) (Kuwari Pass) D/C 400 135 Punatsangchu-I - Alipurduar D/C 400 128 174 152 135 24 JAN-15 DEC-16 Gen. expected beyound 2017-18. Wild life sanctuary involved. Case under process at NBWL. 136 RAPP - Kota line D/C 400 104 130 40 16 MAR-15 DEC-16 Forest clearance for Bundi & Kota Div. are awaited.77nos. location are in forest. Critical 137 Raigarh Pooling Station (Near Kotra) - Champa S/C 765 96 247 247 247 96 MAY-14 MAY-15 Commissioned 05/15. Pooling Station line 138 Raipur Pooling station - Wardha line -II D/C 765 713 961 715 525 184 JAN-15 JUN-16 Stage-I Forest clearance (295 Ha)received in Jun'15. Permission to work obtained in July 15. 139 Ranchi (New) - Dharamjaygarh /Near Korba S/C 765 341 921 914 911 330 AUG-14 OCT-15 Permission to work in forest received in May'15. 140 Ranchi - Jharkhand Pool line (Quad) D/C 400 136 195 195 195 138 NOV-13 DEC-15 Testing under progress. Completion matching with Jharkhand Pool & Jharkhand Pool bey at line. 141 Rangpo - New Melli line (Twin Moose) (20.5 D/C & 1.5 MC+D/ 220 54 115 115 115 54 NOV-13 MAY-15 Commissioned 05/15. M/C) C 142 Rihand - Vindhyachal Pooling Station (2nd Ckt) D/C 765 31 91 91 91 31 NOV-12 AUG-15 Ready for Commissioning in 08/15. 143 Roing - Tezu line S/C on 132 60 244 196 157 31 APR-12 MAR-16 Progress affected due to severe ROW problem.Critical D/C 144 Roorkee - Saharanpur line (Quad) D/C 400 76 100 98 98 53 APR-13 DEC-15 ROW problem in western UP. 145 Salem Pooling Station - Madhugiri Pooling Station line S/C 765 244 645 596 482 85 SEP-14 DEC-15 Severe ROW being faced in Karnataka.Critical. 146 Salem Pooling Station - Salem D/C 400 120 165 165 165 120 SEP-14 AUG-15 Ready for commissioning 08/15. 147 Sasan - Vindhyachal (PS) S/C 765 6 18 18 18 6 APR-15 APR-15 Commissioned 04/15. 148 Sasaram - Allahabad line D/C 400 4 11 11 10 5 MAY-15 DEC-15 149 Sasaram - Deltonganj line D/C 400 392 523 508 460 284 NOV-12 DEC-16 Completion matching with Daltanganj S/S delayed due to non-availibility of S/S land (land acquired in May'15). Legends TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 9 of 122 Construction progress Status Target Date Name of Ckts Total Towers Sl (S/C) Voltage Lengt Transmission Remark No & Level h TL STC TE STG Revised/ Lines (D/C) cKM (Nos) (Nos) (Nos) (cKM) Schedule Anticipate d 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 150 Sholapur STPP - Sholapur line - II D/C 400 22 35 MAR-17 MAR-17 Award placed in May'15. 151 Sholapur STPP - Sholapur line-I D/C 400 22 35 35 35 22 OCT-15 APR-15 Ready for commissioning 04/15. 152 Sikar - Jaipur line D/C 400 336 480 461 425 185 AUG-12 MAR-16 Contract reviewed through assignement to JV partner. 153 Silchar - Hailakandi (Contingency arrangement) D/C 132 50 65 65 65 39 JUN-12 Line test charged in Jun'12. 154 Silchar - Melriat (New) line (charged at 132KV) D/C 400 286 436 366 211 101 DEC-12 JUN-16 Major portion of line in forest. severe ROW in vicinity of Aizwl town due to stiff resistance from influential local owner. package under re-tendering. 155 Silchar - Purba Kanchan Bari line (charged at 132KV) D/C 400 254 373 373 373 254 DEC-12 JUL-15 Commissioned 07/15. 156 Siliguri - Purnea D/C 400 SEP-13 SEP-15 157 Singrauli - Allahabad line D/C 400 170 422 148 31 JUN-16 JUN-16 Work under progress. 158 Srikakulam PP - Vemagiri - II Pooling Station (Vizag D/C 765 668 877 691 372 40 AUG-16 AUG-16 Work under progress. TCL) 159 Srikakulam Pooling Station - Angul line D/C 765 552 726 56 376 116 JUN-15 AUG-16 Stage - I forest clearance awaited (99 Ha.).1 package under re-tended & awarded in Jun'15. Completion matching with Srikakulam - Vimagiri being executed under TBCB route (sch. Aug'16). 160 Suraj mani nagar - North Comilla (Indian portion) D/C 400 46 63 22 MAR-16 Efforts being made to complete by Dec'15. 161 Tapovan Vishnugadh - Kunwari Pass D/C 400 MAR-17 Investment approval pending. 162 Tehri Gen. - Tehri Pooling Station (Q) D/C 400 18 NOV-17 NOV-17 Award placed in Feb'15. 163 Tehri PSP - Tehri Pooling Station S/C 400 16 164 Tehri Pooling Station - Meerut D/C 765 4 NOV-17 NOV-17 Award placed in Feb'15. Engg in progress. 165 Tezu - Namsai line. S/C on 132 90 332 213 153 32 DEC-12 MAR-16 Progress affecetd due to severe ROW problem. D/C 166 Tuticorin Pooling Station - Salem Pooling Station D/C 765 739 1000 992 579 110 SEP-14 JUN-16 Contractual issue. 167 Unchahar - Fatehpur D/C 400 60 SEP-16 168 Vapi (PG) - Kala - Kudus D/C 400 236 346 205 185 90 JUN-16 Due to severe ROW problem at Novi Mumbai end, line was decided to be terminatedat Kudus S/stn.of MSETCL. 169 Vapi (PG) - Navi Mumbai D/C 400 258 346 205 185 90 SEP-10 JUN-16 Due to severe ROW portion at Navi-Mumbai end,Line now decided to the terminated at Kudus S/stn. of MSETCL. Contigency arrangement to connect Vapi-Navi Mumbai with Navsari-Boisar line by passing ROW area to form Vapi- Navsari line (24 Ckm) commissioned in Mar'13.40KV D/C Legends TL: Total Location STC: Stubs Cast TE: Towers Erected STG: Stringing Completed Trasmission Lines: Page 10 of 122

Description:
Legends. TL: Total Location. STC: Stubs Cast. TE: Towers Erected Ready for commissioning 09/15. Completion matching with Varanasi Sub station. 133 Aportion of line (279 Ckm) commissioned in April'12. balance portion under hold Down strem system being execution by State not available.
See more