Delivery Order No. 0008 Environmental Services Program Support DACA31-94-D-0064 Team Radford RADFORD ARMY AMMUNITION PLANT, VIRGINIA Master Work Plan Quality Assurance Plan Health a,nd Safety Plan Addendum 01 0: Facility-Wide Background Study FINAL DOCUMENT September 2000 Rdbrdhry~mrm#~MnI Rwu 11% PA.- 1 RmdW, VA 2414 1 USA Mr. Roben lbmsm U. S. E n v i m 4l wcccim 4mcy kgkm Ill 16SOAnhSvecr Phildolphi~P~,A 19 10-9 - > SU~@Z ~ a k P l m A ~ O 1F0rtlb:W idc-SNdy WorkPhnnddmdun011: Soil SunpliagrrdReptbg~aSWMU6, Im EPA V A l 2 1 ~ 3 0 Dear Mr. Thornson: lh cmtenb of WarL Plan Addandum 010 wac diffurstd in an Augra 10,2090 tean mecling a ya~orf fbe Aa MS Word versian ofhe rnirlutcs w md ihbund A m1 6,W. A WordPczkt wnion ufthcs mihum ms srrm p u Nwembcr 27,2600. 1 apalogiac tir (ht bmm@Iriility. Tbe amtuds d Wak P&I M u m01 1 were dixused in an October 24 2000 temr mwting at yaw offix. Draft d n g ~ ~ ~ i n , t h e ; r l r m d e e r o a N o v m b c1r,2 000viacrariL No~~mm~~w@mcdYzdmd WaPBn AddardamOIlwwmrirsdpulhcssmtecin~minW~ ilhimlbcnrall,raoriflarianephrib#lQP b~nnyboonoaa#,U~~~-ldbkginthssanpIirrgeffatoaNovanbcr13,~P)k~r~s)e.m tbathc sunp~~dM~inas~kdonNw~mbsr13ud~eampkad#1Nwanba1&2000, 0 Pknro caardim with and povidc ury puestions or ummm~rto . JayR cdda of ny s t d( 540) 639-7536 or Jlm McbnaA CO StaZT(S90) 639-864 1. c,A . jlkq I#riro&wmi Mmqer All'hnt Ammdond Powder Company U C Shran Wilcax Virginia Oepmmnt of Emiranrumral Wiry P. 0.B ax 10009 Ridumd, VA 23240.0009 Rmacll FA.. pa.€, EPA k&h111 ~ Wdc Phn Addendom 010: Fwili- W& 8.zkgound Sw Woh Plw ~ddrndrrm0 1 1: Sail wing nb Rsponicyt a SWMU 4 Radkrd AmmdhP k SIGNATURE: PRINTED NAME: COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVlRONMENTAL QUALITY H. Treacy James S. Gilrnore, 111 Director Governor Street address: 629 East Main Street, Richmond, Virginia 23219 Mailing adakess: P.O.B ox 10009, Richmond, Virginia 23240 John Paul Woodley, Jr. Fax (804) 698-4500 TJJD (804) 698-4021 Secretary of Natural Resources http://www.dq.state.vaus October 16,2000 Mr. Jim McKenna Radford -Army Ammunition Plant SIORF-SE-EQ P.O. Box 2 Radford, Virginia 24 14 1-0089 RE: Addendum 0 10, Facility-Wide Background Study Dated August 2000 Dear Mr. McKenna: r L3 I have reviewed the above referenced work plan addendum. Given that the sampling had occurred prior to our receipt of the work plan and that EPA has already approved the plan, no comments will be provided at this time. However, please ensure that ample review time is provided for any fbture documents. I look forward to reviewing the report containing the sampling results fiom this background study and meeting with you for a site visit on October 18', 2000. Very truly, Sharon Wilcox Federal Facilities Restoration Program (804) 6987-4 143 [email protected] cc: Durwood Willis, VDEQ Aziz Farahmand, WCRO Rob Thompson, Region 111, EPA Norm Auldridge, WCRO C File: Radford AAP, 2000 Chronological An Agency of the Natural Resources Secretariat McKenna. Jim 0: McKenna, Jim To: Thursday, October 05, 2000 1:06 PM 'durwood willis'; 'sharon wilcox' Cc: 'john e tesner'; Redder, Jerome Subject: FW: Backgrnd Study Work Plan u backgmdWPapprov a1.W Sharon, Don't if the fax will come through clearly so I'm forwarding the email message from Rob Thomson with the review and approval letter attachment. Jim ----- Original Message----- From: [email protected] [mailto:[email protected]] Sent: Tuesday, September 26, 2000 11:22 AM To : Redder, Jerome; McKenna, Jim Cc: [email protected] Subject: Backgrnd Study Work Plan ched, please find the EPA review letter for the Background Study Rob (See attached file: backgrndWPapproval.wpd) McKenna, Jim Thomson .Bob@e pamail.epa.gov Tuesday, September 26,2000 11 :22 AM Redder, Jerome; McKenna, Jim Cc: [email protected] Subject: Backgmd Study Work Plan Attached, please find the EPA review letter for the Background Study Work Plan Rob (See attached file: backgrndWPapprova1.wpd) UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION Ill 1650 Arch Street Philadelphia, Pennsylvania 1910 3-2029 September 26, 2000 In reply Refer to 3HS13 CERTIFIED MAIL RETURN RECEIPT REQUESTED Commander, Radford Army Ammunition Plant Attn: SIORF-SE-EQ (Jim McKenna) P.O. Box 2 Radford, VA 24141-0099 C.A. Jake Environmental Manager Alliant Techsystems, Inc. C Radford Army Ammunition Plant P.O. Box 1 Radford, VA 24141-0100 Re: Radford Army Ammunition Plant Work Plan submittals and reviews Dear Mr. McKenna and Ms. Jake: The U.S . Environmental Protection Agency (EPA) has reviewed the Army's draft Facility-Wide Background Study Work Plan, Addendum 010 for the New River Storage Depot (NRU), and the Radford Army Ammunition Plant (RAAP). Based upon our review, the Facility- Wide Background Study Work Plan is approved, and meets the requirements of Part 11. (C)( 3)( a) of RAAP1s Corrective Action Permit. In accordance with Part 11. (I)( 2) of RAAP's Corrective Action Permit, the schedule contained within the Facility- Wide Background Study Work Plan is henceforth incorporated into the Permit. Thus, the complete schedule contained . in Appendix B, including the deliverable date of February 14, 2001 for the draft Background Report is now finalized. 6 If you have any questions, please call me at 215-814-3357. Celebrating 25 Years of Environmental Progress Robert Thornson, PE Federal Facilities Branch cc: Russell Fish, EPA Lynn Flowers, EPA Leslie Romanchik, VDEQ-RCRA Sharon Wilcox, VDEQ-CERCLA Celebrating 25 Years of Environmental Progress Alliant Techsystems Inc. Radford Army Arnmunition Plant Route 114 August 30,2000 P.O.B ox 1 Radford, VA 24141-0100 Mr. Robert -Thornson U. S. Environmental Protection Agency Region Ill 1650 Arch Street Philadelphia, PA 19103-2029 Subject: Addendum 010: Facility Wide Background Study Radford Army Ammunition Plant EPA ID# VA 1 2 10020730 Dear Mr. Thornson: Enclosed is a certified copy of the "Addendum 010: Facility Wide Background Study Radford Army Ammunition Plant". Your six additional copies and Mr. Harris' copy will be sent under separate cover. Per July 20, 2000 conversation with Mr. Harris, a copy to Ms Leslie Romanchik is no longer necessary. The contents of this work plan were discussed in an August 10,2000 team meeting at your office. Draft meeting minutes were provided August 16,2000 via email. Comments on the meeting minutes received August 24,2000 from Ms. Lynn Flowers relate to data evaluation and not to fieldwork execution. Per the email, the Army's contractor, IT Group, has begun the fieldwork on August 28,2000. > C Please coordinate with and provide any questions or comments to myself at (540) 639-8266, Jerry Redder of my staff (540) 639-7536 or Jim McKenna, ACO Staff (540) 639-864 1. SJe ?; C. A. Jake, En nmental Manager Alliant Ammunition and ~owderkom~aLnL~C, Enclosure c: W/Oe nclosure Russell Fish, P.E., EPA Region I II Devlin Harris Virginia Department of Environmental Quality P. 0. Box 10009 Richmond, VA 23240-0009 Alliant Techsystems Inc. Radford Army Ammunition Plant Route 114 August 30,2000 P.O. Box 1 Radford, VA 241 41-0100 Mr. Robert Thomson U. S. Environmental Protection Agency Region I1 I 1650 Arch Street Philadelphia, PA 1910 3-2029 Subject: Addendum 010: Facility Wide Background Study Radford Army Ammunition Plant EPA ID# VA 1 2 1 0020730 Dear Mr. Thomson: Enclosed is a certified copy of the "Addendum 010: Facility Wide Background Study Radford Amy Ammunition Plant". Your six additional copies and Mr. Harris' copy will be sent under separate cover. Per July 20, 2000 conversation with Mr. Harris, a copy to Ms Leslie Romanchik is no longer necessary. The contents of this work plan were discussed in an August 10,2000 team meeting at your office. Draft meeting minutes were provided August 16,2000 via email. Comments on the meeting minutes received August 24,2000 from Ms. Lynn Flowers relate to data evaluation and not to fieldwork execution. Per the email, the Amy's contractor, IT Group, has begun the fieldwork on August 28,2000. C Please coordinate with and provide any questions or comments to myself at (540) 639-8266, Jeny Redder of my staff (540) 639-7536 or Jim McKenna, ACO Staff (540) 639-864 l . SFin reIly1, 4 & >@ C. A. Jake, ~nvik6nmentaMl anager Alliant Ammunition and Powder Company, LLC Enclosure c: W/Oe nclosure Russell Fish, P.E., EPA Region Ill Devlin Harris Virginia Department of Environmental Quality P. 0. Box 10009 Richmond, VA 23240-0009 bc: Administrative File Coordination: . J. McKenna, ACO Staff McKenna S. J. Barker-ACO Staff Rob Davie-ACO Staff C. A. Jake J. J. Redder Env. File
Description: