ebook img

Kirtland AFB BFF PDF

92 Pages·2013·3.99 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Kirtland AFB BFF

KIRTLAND AIR FORCE BASE ALBUQUERQUE, NEW MEXICO PHASE II REMEDIATION INTERIM MEASURES PLAN SOIL-VAPOR EXTRACTION TREATMENT SYSTEM DESIGN BULK FUELS FACILITY SPILL SOLID WASTE MANAGEMENT UNITS ST-106 AND SS-111 KIRTLAND AIR FORCE BASE, NEW MEXICO December 2012 Prepared for U.S. Army Corps of Engineers Albuquerque District Albuquerque, New Mexico 87109 USACE Contract No. W912DY-10-D-0014 Delivery Order 0002 Prepared by Shaw Environmental & Infrastructure, Inc. 9201 East Dry Creek Road Centennial, Colorado 80112 NOTICE This report was prepared for the U.S. Army Corps of Engineers by Shaw Environmental & Infrastructure, Inc. for the purpose of aiding in the implementation of a final remedial action plan under the U.S. Air Force Environmental Restoration Program. As the report relates to actual or possible releases of potentially hazardous substances, its release prior to a final decision on remedial action may be in the public’s interest. The limited objectives of this report and the ongoing nature of the Environmental Restoration Program, along with the evolving knowledge of site conditions and chemical effects on the environment and health, must be considered when evaluating this report, since subsequent facts may become known which may make this report premature or inaccurate. Government agencies and their contractors registered with the Defense Technical Information Center (DTIC) should direct requests for copies of this report to: DTIC, Cameron Station, Alexandria, Virginia 22304-6145. Non-government agencies may purchase copies of this document from: National Technical Information Service, 5285 Port Royal Road, Springfield, Virginia 22161. THIS PAGE INTENTIONALLY LEFT BLANK Form Approved REPORT DOCUMENTATION PAGE OMB No. 0704-0188 Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. 1. AGENCY USE ONLY 2. REPORT DATE 3. REPORT TYPE AND DATES COVERED December 2012 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS Phase II Remediation Interim Measures Plan, Soil-Vapor Extraction Treatment System Design, Bulk Fuels USACE Contract No. W912DY-10-D-0014 Facility, Spill, Solid Waste Management Units ST-106 and SS-111, Kirtland Air Force Base, New Mexico Delivery Order 0002 6. AUTHOR D. Agnew 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING ORGANIZATION REPORT NUMBER Shaw Environmental & Infrastructure, Inc. 9201 East Dry Creek Road KAFB-012-0035c Centennial, CO 80112 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSORING/MONITORING AGENCY REPORT NUMBER USACE Albuquerque District 4101 Jefferson Plaza NE Albuquerque, NM 87109-3435 Project Manager: Walter Migdal 11. SUPPLEMENTARY NOTES 12a. DISTRIBUTION/AVAILABILITY STATEMENT 12b. DISTRIBUTION CODE 13. ABSTRACT (Maximum 200 words) This Plan describes the Phase II interim measures remediation activities for the final design and operation of a catalytic oxidation soil vapor treatment system. Quarterly monitoring data from previous quarters were used to optimize the system design, and follow-on quarters of monitoring will be used to inform system operation and optimization. Additionally, data collected during the operation of this system will be used to inform any future remediation operations at the project site. The system will be installed in accordance with applicable state and local requirements and the approved engineering drawings included in this report. 14. SUBJECT TERMS 15. NUMBER OF PAGES 104 Bulk Fuels Facility; soil-vapor extraction systems; remediation systems operations 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY CLASSIFICATION 19. SECURITY CLASSIFICATION 20. LIMITATION OF ABSTRACT OF REPORT OF THIS PAGE OF ABSTRACT UNCLASSIFIED UNCLASSIFIED UNCLASSIFIED NSN 7540-01-280-5500 Standard Form 298 (Rev 2-89) Prescribed by ANSI Std 239-18 298-102 THIS PAGE INTENTIONALLY LEFT BLANK 40 CFR 270.11 DOCUMENT CERTIFICATION 40 CFR 270.11 DOCUMENT CERTIFICATION NOVEMBER 2012 I certify under penalty of law that this document and all attachments were prepared under my direction or supervision according to a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations. JOHN C. KUBINEC, Colonel, USAF Commander, 377th Air Base Wing This document has been approved for public release. KIRTLAND AIR FORCE BASE 377th ABW Public Affairs Kirtland AFB BFF December 2012 Phase II Remediation Interim Measure Plan i KAFB-012-0035c 40 CFR 270.11 DOCUMENT CERTIFICATION THIS PAGE INTENTIONALLY LEFT BLANK Kirtland AFB BFF December 2012 Phase II Remediation Interim Measure Plan ii KAFB-012-0035c PREFACE PREFACE This Phase II Remediation Interim Measures Plan for Soil-Vapor Extraction Treatment System Design has been prepared by Shaw Environmental & Infrastructure, Inc. (Shaw) for the U.S. Army Corps of Engineers (USACE), under Contract W912DY-10-D-0014, Delivery Order 0002. It pertains to the Kirtland Air Force Base Bulk Fuels Facility Spill, Solid Waste Management Units ST-106 and SS-111, located in Albuquerque, New Mexico. This report was prepared in accordance with all applicable federal, state, and local laws and regulations, including the New Mexico Hazardous Waste Act, New Mexico Statutes Annotated 1978, New Mexico Hazardous Waste Management Regulations, Resource Conservation and Recovery Act, and regulatory correspondence between the New Mexico Environment Department Hazardous Waste Bureau and the U.S. Air Force, dated April 2, June 4, August 6, and December 10, 2010. This work will be performed under the authority of USACE Contract No. W912DY-10-D-0014, Delivery Order 0002. Mr. Walter Migdal is the USACE Albuquerque District Project Manager; Mr. Wayne Bitner, Jr. is the Kirtland Air Force Base Restoration Section Chief; and Mr. Thomas Cooper is the Shaw Project Manager. This report was prepared by Diane Agnew. Thomas Cooper, PG, PMP Shaw Environmental & Infrastructure, Inc. Project Manager Kirtland AFB BFF December 2012 Phase II Remediation Interim Measure Plan iii KAFB-012-0035c PREFACE THIS PAGE INTENTIONALLY LEFT BLANK Kirtland AFB BFF December 2012 Phase II Remediation Interim Measure Plan iv KAFB-012-0035c

Description:
8 fuel (JP-8), diesel fuel, and aviation gasoline (AVGAS) was managed in (Building 2401) is used for the delivery of diesel and unleaded gasoline .. Well KAFB-106131-450, which is 381 ft from the extraction well, was used as . buoyancy force resulting from a density difference of 0.2 gram per cubi
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.