ebook img

International Journal of Production Economics 2001: Vol 74 Index PDF

3 Pages·2001·0.58 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview International Journal of Production Economics 2001: Vol 74 Index

international journal of production economics Int. J. Production Economics 74 (2001) 315-316 www.elsevier.com/locate/dsw Author Index to Volume 74 Ait-Kadi, D., see Chelbi, A. 74 (2001) 183 Alain, G., Multi-site planning: A transshipment problem 74 (2001) 21 Alemany, M.E., see Vicens, E. 74 (2001) Andrés, C., see Vicens, E. 74 (2001) Artiba, A., Productive systems: Strategy, control, and management 74 (2001) Artiba, A., see Riane, F. 74 (2001) Artigues, C. and F. Roubellat, A Petri net model and a general method for on and off-line multi- resource shop floor scheduling with setup times 74 (2001) Baptiste, P. and C. Jacquemard, Exact distribution of the makespan in a two machines flow shop with two kinds of jobs 74 (2001) Beach, R., A.P. Muhlemann, D.H.R. Price, A. Paterson and J.A. Sharp, The role of qualitative methods in production management research 74 (2001) 201 Bengtsson, J., Manufacturing flexibility and real options: A review 74 (2001) 213 Benyoucef, L., Y. Frein and B. Penz, Optimal solution for a two-product dynamic scheduling problem in a just-in-time environment 74 (2001) 85 Bertrand, J.W.M., see Ouenniche, J. 74 (2001) 49 Bertrand, J.W.M., see van Ooijen, H.P.G. 74 (2001) 261 Bodmann, B.E.J. and A.T. Gomez, The self-consistent parametric inference algorithm (SPI): Optimisation in continuous search space 74 (2001) 303 Brauner, N. and G. Finke, Optimal moves of the material handling system in a robotic cell 74 (2001) 269 Cavory, G., R. Dupas and G. Goncalves, A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line 74 (2001) 135 Chelbi, A. and D. Ait-Kadi, Spare provisioning strategy for preventively replaced systems subjected to random failure 74 (2001) 183 Ciprut, P., see Hongler, M.-O. 74 (2001) 115 Cloutier, L., see Frayret, J.-M. 74 (2001) 239 Costa, A.F.B., see De Magalhaes, M.S. 74 (2001) 191 D’Amours, S., see Frayret, J.-M. ' 74 (20012)3 9 De Magalhaes, M.S., E.K. Epprecht and A.F.B. Costa, Economic design of a Vp X chart 74 (20011)9 1 Dhaenens-Flipo, C., A bicriterion approach to deal with a constrained single-objective problem 74 (2001) 93 Diallo, M., H. Pierreval and A. Quilliot, Manufacturing cells design with flexible routing capability in presence of unreliable machines 74 (20011)7 5 Dohi, T., H. Okamura and S. Osaki, Optimal control of preventive maintenance schedule and safety stocks in an unreliable manufacturing environment 74 (20011)4 7 Dupas, R., see Cavory, G. 74 (20011)3 5 Elmaghraby, S.E., On the optimal release time of jobs with random processing times, with extensions to other criteria 74 (2001) 103 Epprecht, E.K., see De Magalhaes, M.S. 74 (2001) 191 PII: S0925-5273(01)00210-9 316 Author Index to Volume 74 Favrel, J., see Martinez, M.T. 74 (2001) 225 Finke, G., see Brauner, N. 74 (2001) 269 Fouletier, P., see Martinez, M.T. 74 (2001) 225 Frayret, J.-M.,S. D’Amours, B. Montreuil and L. Cloutier, A network approach to operate agile manufacturing systems 74 (2001) 239 Frein, Y., see Benyoucef, L. 74 (2001) 85 Ghattas, R.E., see Salameh, M.K. 74 (2001) 157 Gomez, A.T., see Bodmann, B.E.J. 74 (2001) 303 Goncalves, G., see Cavory, G. 74 (2001) 135 Guarch, J.J., see Vicens, E. 74 (2001) 5 Hongler, M.-O. and P. Ciprut, Production indices obtained by a myopic policy for non- Markovian dynamics 74 (2001) 115 lassinovski, S., see Riane, F. 74 (2001) 33 Jacquemard, C., see Baptiste, P. 74 (2001) 77 Janssens, G.K., see S6rensen, K. 74 (2001) 163 Martineau, P., see Tacquard, C. 74 (2001) 279 Martinez, M.T., P. Fouletier, K.H. Park and J. Favrel, Virtual enterprise — organisation, evolution and control 74 (2001) 225 Montreuil, B., see Frayret, J.-M. 74 (2001) 239 Muhlemann, A.P., see Beach, R. 74 (2001) 201 Okamura, H., see Dohi, T. 74 (2001) 147 Osaki, S., see Dohi, T. 74 (2001) 147 Ouenniche, J. and J.W.M. Bertrand, The finite horizon economic lot sizing problem in job shops: The multiple cycle approach 74 (2001) 49 Park, K.H., see Martinez, M.T. 74 (2001) 225 Paterson, A., see Beach, R. 74 (2001) 201 Penz, B., see Benyoucef, L. 74 (2001) 85 Pierreval, H., see Diallo, M. 74 (2001) 175 Price, D.H.R., see Beach, R. 74 (2001) 201 Quilliot, A., see Diallo, M. 74 (2001) 175 Riane, F., A. Artiba and S. lassinovski, An integrated production planning and scheduling system for hybrid flowshop organizations 74 (2001) 33 Roubellat, F., see Artigues, C. 74 (2001) 63 Salameh, M.K. and R.E. Ghattas, Optimal just-in-time buffer inventory for regular preventive maintenance 74 (2001) 157 Sharp, J.A., see Beach, R. 74 (2001) 201 Sérensen, K. and G.K. Janssens, Buffer allocation and required availability in a transfer line with unreliable machines 74 (2001) 163 Suliman, S.M.A., Pattern generating procedure for the cutting stock problem 74 (2001) 293 Tacquard, C. and P. Martineau, Automatic notation of the physical structure of a flexible manufacturing system 74 (2001) 279 Thomalla, C.S., Job shop scheduling with alternative process plans 74 (2001) 125 van Ooijen, H.P.G. and J.W.M. Bertrand, Economic due-date setting in job-shops based on routing and workload dependent flow time distribution functions 74 (2001) 261 Vicens, E., M.E. Alemany, C. Andres and J.J. Guarch, A design and application methodology for hierarchical production planning decision support systems in an enterprise integration context 74 (2001) $5

See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.