ebook img

International Journal of Production Economics 1995: Vol 41 Index PDF

3 Pages·1995·0.53 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview International Journal of Production Economics 1995: Vol 41 Index

international journal of production economics Int. J. Production Economics 41 (1995) 441-443 Author Index to Volume 41 Abdel-Malek, L.L., Design for automated assembly of circular parts: An algorithm (1995) Agliari, A., M. Diligenti and L. Zavanella, Variable priority dispatching rules: An analytical approach (1995) Agrell, P.J., A multicriteria framework for inventory control (1995) Albino, V. and A.C. Garavelli, A methodology for the vulnerability analysis just-in-time production systems (1995) Barad, M., Some cultural/geographical styles in quality strategies and quality costs (P.R. China versus Australia) (1995) Bellgran, M. and C. Johansson, A method for the design of flexible assembly systems (1995) Bengtsson, J. and M.I. Johansson, Unit load size as a function of the degree of overtaking (1995) 103 Bolmsj6, G., see Hedenborn, P. (1995) 161 Breining, R., see Kenn, P. (1995) 203 Bruun, P., Case study of productivity and quality aspects in production technology transfer to China (1995) 109 Brynzer, H. and M.I. Johansson, Design and performance of kitting and order picking systems (1995) 115 Buhanist, P., see Kosonen, K. (1995) 211 Bullinger, H.-J., F. Fremerey and J. Fuhrberg-Baumann, Innovative production structures — Precon- dition for a customer-oriented production management (1995) 15 Buxey, G., A managerial perspective on aggregate planning (1995) 127 Claus, J., see Wolters, W.T.M. (1995) 405 Dagli, C.H. and S. Sittisathanchai, Genetic neuro-scheduler: A new approach for job shop scheduling (1995) 135 Diligenti, M., see Agliari, A. (1995) 51 de Ron, A.J., Measure of manufacturing performance in advanced manufacturing systems (1995) 147 Dernroth, J., see Nilsson, C.-J. (1995) 281 Eckert, R., see Kern, P. (1995) 203 Franks, I.T., see Jin, J.Q. (1995) 185 Franzen, M., see Zackrisson, J. (1995) 419 Fremerey, F., see Bullinger, H.-J. (1995) 15 Fuhrberg-Baumann, J., see Bullinger, H.-J. (1995) 15 Fujita, S., see Tamura, T. (1995) 377 Garavelli, A.C., see Albino, V. (1995) 71 Gertsen, F., see Sun, H. (1995) 369 Grubbstrém, R.W., Modelling production opportunities — an historical overview (1995) 1 Hautaniemi, P., see Pirttila, T. (1995) 327 Hedenborn, P. and Bolmsjo, G., Robotics in automated inspection (1995) 161 Heitz, M.-J., see Zilch, G. (1995) 429 Hiiser, M., see Warnecke, H.J. (1995) 37 Hyvarinen, L., SME financiers’ qualitative evaluation criteria in development projects (1995) 177 0925-5273/95/$09.50 © 1995 Elsevier Science B.V. All rights reserved 442 Author Index to Volume 41 Innala, M. and S. Torvinen, Integrating computer aided quality assurance in flexible engineering and production processes 41 (1995) 179 Jin, J.Q., Franks, .T. and M. Loftus, The development of an integration modelling method for manufacturing cell control systems 41 (1995) 185 41 (1995) 93 Johansson, C., see Bellgran, M. 41 (1995) 103 Johansson, M.I., see Bengtsson, J. 41 (1995) 115 Johansson, M.I., see Brynzen, H. Kabir, M.A. and M.T. Tabucanon, Batch-model assembly line balancing: A multiattribute decision making approach 41 (1995) 193 Kawada, A., see Kuroda, M. 41 (1995) 217 Kern, P., R. Breining and R. Eckert, Workplace design — General view and some special experiences 41 (1995) 203 Kosonen, K. and P. Buhanist, Customer focused lean production development 41 (1995) 211 Kuroda, M. and A. Kawada, Adaptive input control for job-shop type production systems with 41 (1995) 217 varying demands using inverse network analysis Kurosu, S., see Matsuura, H. 41 (1995) 267 41 (1995) 405 Lambert, A.J.D., see Wolters, W.T.M. Landeweerd, H.R.A., see Mantel, R.J. 41 (1995) 257 Larjola, J., Electricity from industrial waste heat using high-speed organic Rankine cycle (ORC) 41 (1995) 227 Lebas, M.J., Performance measurement and performance management 41 (1995) 23 Lehtimaki, A., see Matsuura, H. 41 (1995) 267 Leinsdorff, T., Buying behaviour and product planning 41 (1995) 237 Levitin, G., see Rubinovitz, J. 41 (1995) 343 Lindau, R.A. and K.R. Lumsden, Actions taken to prevent propagation of disturbances in manufac- turing systems 41 (1995) 241 Loftus, M., see Jin, J.Q. 41 (1995) 185 41 (1995) 399 Lumsden, K., see Weldel, J. Lumsden, K.R., see Lindau, R.A. 41 (1995) 241 Makis, V., Optimal replacement of a tool subject to random failure 41 (1995) 249 Mantel, R.J. and H.R.A. Landeweerd, Design and operational control of an AGV system 41 (1995) 257 Masui, T., see Yurimoto, S. 41 (1995) 411 Matsuura, H., S. Kurosu and A. Lehtimaki, Concepts, practices and expectations of MRP, JIT and OPT in Finland and Japan 41 (1995) 267 41 (1995) 419 Melbin, M., see Zackrisson, J. Molinder, A., Application of calculus of variations to a continuous time aggregate production model 41 (1995) 273 Nilsson, C.-H. and J. Dernroth, The strategic grounding of competitive advantage — The case of Scania 41 (1995) 281 Nironen, E., Corporate strategy and culture in a conversion process: Adjustment in defence industry 41 (1995) 297 O’Brien, C. and S.J.E Smith, Strategies for encouraging and managing technological innovation 41 (1995) 303 O’Brien, C. and S.J.E. Smith, Design maturity assessment for concurrent engineering co-ordination 41 (1995) 311 Ogawa, S. and H. Ohta, Common order cycle system for multi-item inventory model with learning in ordering and transportation 41 (1995) 321 Ohba, M., see Uetake, T. 41 (1995) 395 Ohta, H., see Ogawa, S. 41 (1995) 321 Pirttila, T. and P. Hautaniemi, Activity-based costing and distribution logistics management 41 (1995) 327 Pirttila, T. and J. Sandstrém, Manufacturing strategy and capital budgeting process 41 (1995) 335 Rubinovitz, J. and G. Levitin, Genetic algorithm for assembly line balancing 41 (1995) 343 41 (1995) 335 Sandstrém, J., see Pirttila, T. Schindele, H., see Ziilch, G. 41 (1995) 429 Author Index to Volume 41 443 Segerstedt, A., Cover-Time-Planning, a method for calculation of material requirements 41 (1995) 355 Shahnavaz, H., see Zackrisson, J. 41 (1995) 419 Sittisathanchai, S., see Dagli, C.H. 41 (1995) 135 Smith, S.J.E., see O’ Brien, C. 41 (1995) 303 Smith, S.J.E., see O’ Brien, C. 41 (1995) 311 Sun, H. and F. Gertsen, Organizational changes related to advanced manufacturing technology in the production area 41 (1995) 369 Tabucanon, M.T., see Kabir, M.A. 41 (1995) 193 Tamura, T. and S. Fujta, Designing customer oriented production planning system (COPPS) 41 (1995) 377 Tarjanne, R., Low costs and carbon dioxide emissions through efficient power production methods in Finland 41 (1995) 387 Torvinen, S., see Innala, M. 41 (1995) 179 Tsubone, H., see Uetake, T. 41 (1995) 395 Uetake, T., H. Tsubone and M. Ohta, A production scheduling system in a hybrid flow shop 41 (1995) 395 Warnecke, H.J. and H. Hiiser, Lean production 41 (1995) 37 Wedel, J. and K. Lamsden, The influence of lead-time reductions on decisions and rules in the production planning process 41 (1995) 399 Wolters, W.T.M., A.J.D. Lambert and J. Claus, Sequencing problems in designing energy efficient production systems 41 (1995) 405 Yurimoto, S. and T. Masui, Design of a decision support system for overseas plant location in the EC 41 (1995) 411 Zackrisson, J., M. Franzen, M. Melbin and H. Shahnavaz, Quality by a step-by-step program in low scale industries 41 (1995) 419 Zavanella, L., see Agliari, A. 41 (1995) 51 Zilch, G., M.-J. Heitz and H. Schindele, Use of simulation for planning of work organization in highly automated production systems — Two case studies 41 (1995) 429

See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.