ebook img

Draft final reclamation investigation and expanded engineering evaluation and cost analysis : Spring Meadow Lake site Helena, Montana PDF

2006·19.3 MB·English
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Draft final reclamation investigation and expanded engineering evaluation and cost analysis : Spring Meadow Lake site Helena, Montana

MontanaSlateLibrary 333.73153 E30DFRI 2006 ama Expanded Engl iirj Spring Meadow Lake Sit§ Helena, Montana r}t<~A\~J !>/: Inc. Ei'il :*t* ! Digitized by the Internet Archive in 2010 with funding from Montana State Library http://www.archive.org/details/draftfinalreclam2006tetr SPRING MEADOW LAKE SITE HELENA,MONTANA Section p^ IMRODUCTION 1.0 i_] PURPOSE OF RECLAMATION INVESTIGATION AND EVALUATION 1 1 REPORT ]., 1.2 ORGANIZATION OF INVESTIGATION 1-3 PROJECT MANAGEMENT 1.3 .5 , 1.3.1 Project Team [.5 1 .3.2 Project Schedule \.j 14 REFERENCE CITED !_8 LIST OF FIGURES Figure l':i"e 1-1 SPRING MEADOW LAKE SITE LOCATION MAP 1-2 1-2 SPRING MEADOW AKE SITE COMPREHENSIVE RECLAMATION PROCEDURE I 1-4 .. .. LIST OF TABLES Table l';i''i' 1-1 SPRING MEADOW LAKE SITE PROJECT TEAM 1_6 1-2 SPRINc, \ll.\DOW LAKE SITE PROJECT SCHEDULE 1-8 [.[ SpringMeadowUkcSectionIdoc/Mirdi200S SPRING MEADOW LAKE SITE HELENA, MONTANA Section Page 2.0 ENVIRONMENTAL SETTING 2-1 2.1 SETTING 2-1 CLIMATE 2.2 2-1 2.3 GEOLOGY AND SOILS 2-2 HYDROGEOLOGY 2.4 2-2 HYDROLOGY 2.5 2-3 2.6 VEGETATION AND WILDLIFE 2-3 2.7 LAND USE AND POPULATION 2-3 2.8 REFERENCES CITED 2-3 SpringMeadowLakeSection2.docMarch2005 2-i SPRING MEADOW LAKE SITE HELENA, MONTANA Section Page 3.0 DESCRIPTION OF THE PROPERTY 3-1 3.1 SPRING MEADOW LAKE SITE HISTORY 3-1 3.2 DESCRIPTION OF CURRENT PROPERTY 3-2 3.2.1 Waste Characteristics 3-3 3.2.2 Significant Historical and Cultural Features 3-6 OWNERSHIP INFORMATION 3.3 3-6 3.4 REFERENCES CITED 3-6 LIST OF TABLES Table I'am.' 3-1 HISTORIC LABORATORY ANALYTICAL RESULTS 3-4 3-i SpringMeadowLakeSection3doc/March2005 1 SPRING MEADOW LAKE SITE HELENA, MONTANA Section pa„e 4.0 RECLAMATION WORK PLAN 4_1 4. PRELIMINARY RECLAMATIONOBJECTIVES AND GOALS 4-1 4.1.1 Preliminary Reclamation Objectives 4-1 4.1.2 Preliminary Reclamation Goals 4-1 4.2 FIELD SAMPLING PLAN 4.4 4.2.1 Sampling Objectives 4.5 4.2.2 Soil Sampling Procedures 4-(, 4.2.3 Sediment Sampling Procedures 4.9 4.2.4 Surface Water Sampling Procedures 4-9 4.2.5 Groundwater Installation and Sampling Procedures 4-10 4.2.6 Field Analytical Procedures 4-12 4.2.7 Sample Documentation and Custody 4-12 4.2.8 Sample Preservation and Handling 4-15 4.2.9 Decontamination Procedures 4-17 4.3 QUALITY ASSURANCE PROTOCOL PLAN 4-17 4.3.1 Data Quality 4_1§ 4.3.2 Quality Assurance Objectives 4-24 QA 4.3.3 Sample Collection Procedures 4-29 4.3.4 Sample Documentation and Custody 4-30 4.3.5 Equipment Operation, Maintenance, Calibration, and Standardization 4-30 4.3.6 Analytical Procedures 4-30 4.3.7 Data Reduction, Validation, and Reporting 4-30 4.3.8 Corrective Action Procedures 4-34 4.4 LABORATORY ANALYTICAL PLAN 4-35 4.4.1 Sample Collection Requirements 4-36 4.4.2 LaboratoryRequirements 4-36 4.4.3 Quality Assurance Requirements 4-39 4.4.4 Analytical Methods 4-40 4.5 HEALTH AND SAFETY PLAN 4-41 4.6 REFERENCES CITED 4.53 4_j SpringMeadowLakeSection4.doc/March2005 1 LIST OF TABLES Table Page 4-1 PRELIMINARY RECLAMATION GOALS FOR SURFACE WATER 4-3 4-2 PRELIMINARY RECLAMATION GOALS FOR SOIL AND SEDIMENT 4-4 4-3 PROPOSED SOIL, SEDIMENT, SURFACE WATER, AND GROUNDWATER SAMPLES .4-7 4-4 SAMPLE COLLECTION. PRESERVATION, AND HOLDING TIME REQUIREMENTS...4-16 4-5 SUMMARY OF DATA QUALITY OBJECTIVES 4-23 4-6 PRECISION, ACCURACY, AND COMPLETENESS REQUIREMENTS 4-25 4-7 TARGET REPORTING LIMITS FOR SOIL. SEDIMENT, AND WATER METAL ANALYSIS 4-26 4-8 SUMMARY OF ANALYSES AND ANALYTICAL METHODS 4-37 LIST OF FIGURES Figure Page 4-1 EXISTING AND PROPOSED SAMPLE LOCATION MAP (After Section 4) 4-2 DATA REDUCTION, VALIDATION, AND REPORTING SCHEME 4-33 ATTACHMENTS Attachment Monitoring Well Installation - Standard Operating Procedure No. 020 1 2 Monitoring Well Development - Standard Operating Procedure No. 02 3 Groundwater Sampling - Standard Operating Procedure No. 1 . .• SpnngMeadowLakeSection4doc/March2005

See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.