Cosmopolitan Development Project Cook Inlet, Alaska February, 2017 Business Overview • Small privately-held oil and gas development company • Headquarters in Fort Worth, TX • Operation office in Anchorage, AK • Alaska experienced directors and management team • Project located about six miles north of Anchor Point • 100% lease ownership in Cosmopolitan Unit • Over $350 million invested in Cosmo Unit to date • Emphasis on personnel safety and environmental stewardship Project Overview Asset Details Field located 3 miles offshore Extended reach wells drilled from shore Dual-lateral wells Hydraulic fracture stimulation Spud first well on Nov. 29, 2016 12K BLPD onshore processing facility Tyonek and Hemlock Formations; 24-27 API Hansen Production Facility 38 Acre Pad Geologic Summary •Northeast-southwest-trending anticlinal structure •Supported by local 3-D seismic and 6 wellbores •Target Eocene-Oligocene Hemlock Formation and Lower Tyonek Formation •Seal is the shale-rich member of the Tyonek Formation. •Braided fluvial depositional setting with conglomeratic sandstone Top of structure at 6400’ TVDSS Reservoir Engineering Reservoir model oil saturation Top Starichkof Top Hemlock 8 Reservoir Model History matched to well test data Used for field development planning and profile generation Reserves analysis Geocellular model with 549 layers with 1ft average thickness Upscaled to 42 layers (280K active cells) 7 subzones identified in the Starichkof and 14 within Hemlock Porosity 12-17%, permeability 3-14 md, Water saturation 40% Processing Facility Facility Summary • Processing Facility Capability: To VRU 12,000 BLPD To Gas 12.5 MMSCFD HP Separator • 5000 Barrel Oil Storage Tanks, 2 Sales Oil Loading racks Oil Wells • Sales Gas Pipeline Oil Crude Oil Heat • Control room monitoring Truck • 50 man camp To Water Basic process schematic • First oil sold April 2016 Plan of Development Oil Development Expansion projects Phase 1: 12K BLPD facility, 10 producer wells • Train 2 additional processing capacity • Lower Tyonek oil development • Offshore gas development • Offshore prod platform • Tyonek gas sands • On hold pending tax credit continuation or reasonable alternative Phase 2: Additional infill drilling, waterflood
Description: