ebook img

BIM -Submission Guideline for Architectural Discipline - Corenet PDF

97 Pages·2010·2.9 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview BIM -Submission Guideline for Architectural Discipline - Corenet

BBIIMM --SSuubbmmiissssiioonn GGuuiiddeelliinnee e ffoorr AArrcchhiitteeccttuurraall DDiisscciipplliinn ee While BCA tries to highlight the major points of submission requirements, BCA cannot take into account all the special cases in other regulatory agencies as well as the changing technology. Updated versions will continue to be issued to address and incorporate on-going feedback in an open, collaborative process. All readers of this provisional guide are encouraged to submit feedback to BCA CORENET. No part of these materials should be copied, reproduced or published in any form by any means whatsoever electronic or mechanical including photocopy or by way of any information storage or retrieval system nor should the material be disclosed to other parties without the express written authorisation of Building and Construction Authority. Information and contents set forth in this document are subject to changes and will be released as updates in subsequent version. Building and Construction Authority 5 Maxwell Road #16-00 Tower Block MND Complex Singapore 069110 www.bca.gov.sg We shape a safe, high quality, sustainable and friendly built environment. Version Revision Date Summary of Changes Remarks 3.0 Aug 08 Released to Pilot Sites 3.5 Jan 10  Re-specification of BIM Official Release submission file format to different regulatory agencies  Removal of Appendix D on Naming Convention of BIM Objects  Amendments of URA requirements (Section 2.2)  Addition of requirements from following regulatory agencies: i) BCA CD Shelter; ii) LTA; iii) HDB; and iv) JTC Copyright © 2010 Building and Construction Authority For further comments or questions, please write to: CORENET BIM Team Building and Construction Authority 5 Maxwell Road #16-00 Tower Block MND Complex Singapore 069110 BIM Submission Guideline for Architectural Discipline CONTENTS CONTENTS ................................................................................................................................. i TABLES .................................................................................................................................... iii FIGURES ................................................................................................................................... iii 1. Introduction ............................................................................................. 1 1.1. Purpose of Document ................................................................................................ 1 1.2. Scope ......................................................................................................................... 1 2. General Requirements ........................................................................... 2 2.1. Deliverable Format ..................................................................................................... 2 2.2. Model Scale ............................................................................................................... 3 2.3. Model Orientation and Site Configuration .................................................................. 3 2.4. Standard Naming of File and Drawing Views ............................................................ 3 2.5. Annotations and Dimensions ..................................................................................... 5 2.6. Last Saved Model or Last Saved View ...................................................................... 5 2.7. Model for Addition and Alteration Works/ Re-submission ......................................... 6 3. High-Level Modelling Requirements (Optional) ................................... 8 Appendix A Specific Submission Requirements ...................................... 10 A-1 BCA Submission Requirements............................................................................... 10 1. Building Plan (BP) ............................................................................................... 10 2. CD Shelter (HS/SS) ............................................................................................ 14 A-2 URA Submission Requirements .............................................................................. 19 1. General Requirements for All URA Submissions ................................................ 19 2. GFA Calculation Plan .......................................................................................... 21 3. Proposal /Diagrammatic Plan for Subdivision of Lands/Strata Subdivision Buildings .............................................................................................................. 25 4. Landscape Plan................................................................................................... 25 A-3 NEA-CBPU and PUB Submission Requirements .................................................... 26 1. Development Control .......................................................................................... 26 2. Building Plan on Pollution Control ....................................................................... 29 3. Building Plan on Environmental Health ............................................................... 31 4. Detailed Plan on Sewerage Works (Proposed Sewer/ Sewer Diversion Works) 33 5. Detailed Plan on Sanitary Works (for Sanitary Plumbing & Drainage System/ Sewer Connection) .............................................................................................. 35 6. Detailed Plan on Sewerage M&E Works ............................................................ 36 7. Detailed Plan on Drainage Works – Main Development Submission ................. 37 8. Detailed Plan on Drainage Works – Proposed Roadside Drain/ Culvert ............ 39 i BIM Submission Guideline for Architectural Discipline 9. As-built Plan for TOP/CSC – Proposed Sewer/ Pumping Mains/ Sewer/ Pumping Main Diversion Works ......................................................................................... 41 10. As-built Plan for TOP/CSC – Sanitary Works (Sanitary Plumbing & Drainage System/ Sewer Connection)................................................................................ 43 11. As-built Plan for CSC – Proposed Roadside Drain/ Culvert ............................. 45 12. As-built Plan for CSC – Pumped Drainage System at Basement ..................... 47 13. As-built Plan for CSC – Internal Drain with Deviations ..................................... 47 14. Certified Survey Plan for CSC – Development in the Vicinity of/ Affected by Drainage Reserve ............................................................................................... 48 15. URA Approved Sub-division Plan for CSC – for Site Affected by Drainage Reserve ............................................................................................................... 49 A-4 FSSD Submission Requirements ............................................................................ 50 1. General Requirements for All FSSD Submissions .............................................. 50 2. Air-Conditioning, Mechanical Ventilation and Fire Protection Works .................. 53 A-5 NParks Submission Requirements .......................................................................... 55 1. General Requirements for all NParks Development Application (DC) Submissions ........................................................................................................ 55 2. General Requirements for NParks Building Plan (BP) Submissions (excluding external works submissions) ............................................................................... 58 3. General Requirements for NParks Certificate of Statutory Completion (CSC) Submissions (excluding external works submissions) ........................................ 61 A-6 LTA Submission Requirements ............................................................................... 63 1. General Requirements for LTA/DBC (RAIL) ....................................................... 63 2. LTA/DBC (Rail) – Development Proposal in Railway Protection Zone ............... 63 3. LTA/DBC (Rail) – Building Proposal in Railway Protection Zone ....................... 64 4. LTA/DBC (Rail) – Engineering Work Proposal in Railway Protection Zone ....... 65 5. LTA/DBC (Rail) – Certified Survey Plan ............................................................. 65 6. LTA/DBC (Rail) – Development Proposal in Railway Corridor ........................... 66 7. LTA/DBC (Rail) – Building Proposal in Railway Corridor .................................... 66 8. LTA/DBC (Rail) – Engineering Work Proposal in Railway Corridor .................... 67 9. General Requirements for LTA/DBC (Roads & Transport) ................................. 68 10. General Requirements for LTA/DBC (Vehicle Parking) .................................... 69 A-7 HDB Submission Requirements .............................................................................. 71 A-8 JTC Submission Requirements ............................................................................... 72 Appendix B Standard Certifications for Building Works .......................... 73 B-1 BCA: Qualified Person’s Endorsements .................................................................. 73 B-2 URA: Qualified Person’s Endorsements .................................................................. 76 B-3 FSSD: Qualified Person’s Endorsements ................................................................ 78 Appendix C Step-by-Step Guide Preparing for BIM Submission ............. 81 ii BIM Submission Guideline for Architectural Discipline C-1 Users of Autodesk Revit .......................................................................................... 81 C-2 Users of Graphisoft ArchiCAD and Other 3D Modelling Tools ................................ 84 ACKNOWLEDGEMENTS ....................................................................................................... 90 GLOSSARY OF ACRONYMS USED ..................................................................................... 92 TABLES Table 1 Accepted file format in BIM submission for regulatory approval .................................. 2 Table 2 Naming convention for each 3D model or BIM file submitted ...................................... 3 Table 3 Naming convention for each drawing view .................................................................. 4 Table 4 Colours used for A&A project ....................................................................................... 6 Table 5 Table format of Data of Household Shelter ................................................................ 17 Table 6 Table format of Data of Apartment Units & Data of Storey Shelter ........................... 18 Table 7 Table format of Gross Floor Area Summary .............................................................. 23 Table 8 Table format for summary of existing trees/ single stem palms (for DC Submission) 57 Table 9 Table format for summary of existing trees/ single stem palms (for BP Submission) 60 FIGURES Figure 1 Schematic diagram showing the steps in preparing the 3D CAD model for submission ................................................................................................................. 3 Figure 2 Sample of new erection project with name of plan indicated at the bottom ............... 5 Figure 3 Sample of A&A project / project for re-submission (plan and 3D views) .................... 7 Figure 4 Sample of project for re-submission (plan view for storey with no amendments) ...... 7 Figure 5 Sample of site plan view in BIM model ..................................................................... 10 Figure 6 Sample floor plan with indication of platform levels and room tags ......................... 11 Figure 7 Sample of floor plan with elevation and section line or marker (highlighted in BLUE) .................................................................................................................................. 12 Figure 8 Sample of elevation or sectional view ...................................................................... 12 Figure 9 Sample of layout view with QP’s declaration and company’s profile (BCA BP submission) .............................................................................................................. 13 Figure 10 Sample floor plan with setback distance envelop .................................................. 14 Figure 11 Sample floor plan with trellis ................................................................................... 15 Figure 12 Sample floor plan with down-hang beam ............................................................... 15 Figure 13 Sample of CD Shelter declaration endorsement with standard approval stamp .... 17 Figure 14 Sample of layout view with QP’s declaration and company’s profile (URA submission) .............................................................................................................. 21 Figure 15 Sample floor plan view (a close-up) with space boundary (in BLUE) for GFA calculation ................................................................................................................ 22 Figure 16 Sample of layout view with QP’s declaration and company’s profile (FSSD BP submission) .............................................................................................................. 53 iii BIM Submission Guideline for Architectural Discipline 1. Introduction 1.1. Purpose of Document The objective of this Document is to assist qualified persons (QPs) in developing BIM models to meet new requirements of Building Information Model (BIM) submission. It describes the requirements and guidance for creating BIM with specific object types, associated properties and presentation format to the following regulatory agencies for visual processing: a. Building and Construction Authority (BCA) b. Urban Redevelopment Authority (URA) c. National Environment Agency (NEA) d. Public Utility Board (PUB) e. Fire Safety and Shelter Department (FSSD) f. National Parks Board (NParks) g. Land Transport Authority (LTA) h. Housing and Development Board (HDB) i. JTC Corporation Note: The respective regulatory agency reserves the right to reject and request for necessary correction of any required deliverables or formats that do not meet the requirements. 1.2. Scope This submission guideline contains a list of requirements written in a concise form to guide QPs in preparing BIM submission to the above mentioned regulatory agencies. It is by no means an exhaustive list of requirements of the building works which must be complied with when making a building plan or planning submission. The items in this Standard Guideline may also be amended or revoked when new written laws come into force. For more information or enquiries on the specific submission requirements, please consult the appropriate regulatory agency above. CAD vendors and retailers have developed their own application dependent user manuals. These user manuals should be read carefully as this Document cannot take into account all the special features of individual BIM application. For any submission requirements mentioned in the Appendices that require customisations to a certain extent, QPs are also advised to make reference to the training materials distributed or to consult the respective software vendor for any enquiries on the application. If there are contradictions between this submission guideline and vendor’s instructions, BCA BIM team shall be contacted for clarification. Copyright © 2010 Building and Construction Authority. All Rights Reserved. 1 BIM Submission Guideline for Architectural Discipline 2. General Requirements 2.1. Deliverable Format QPs are required to submit BIM saved in the file format, as summarised in Table 1, upon submission to each of the above mentioned regulatory agencies. Note: All BIM e-submission through CORENET e-Submission System is limited to not more than 100MB per file per submission. If the file size is larger than 100MB, QPs are requested to deliver in CD-ROM to the respective agency. Table 1 Accepted file format in BIM submission for regulatory approval Regulatory Agencies Accepted File Format for BIM Submission Remarks 1) All BIM submissions to URA a. A single BIM in the native format 1: For Major project (e.g. phase i. Autodesk Revit (.rvt); or condominium development), ii. Graphisoft ArchiCAD (.pla) separate BIM native files can be submitted for each building block. b. A single light-weighted file format, as However, a SITE BIM file linking published from the similar BIM native file: all the buildings should be i. DWF (.dwf); or submitted. ii. PDF (.pdf) 2) BIM submissions to other a. A single light-weighted file format, as The respective regulatory agency regulatory agencies: published from the similar BIM native file: reserves the right to request BIM a. BCA; i. DWF (.dwf); or native file for verification, ONLY if b. CBPU; ii. PDF (.pdf) necessary. c. PUB; d. FSSD; e. NParks; f. LTA; g. HDB (if any); and h. JTC All drawing views below should be compiled in a single DWF/PDF file. Refer to Appendix C for detailed steps in publishing to DWF/PDF. a. Plans, elevations, sections, layout views or sheets (refer to Appendix A for specific requirements from each regulatory agency); and b. A 3D model. 1 These are based on the IFC certified BIM applications that are commonly used by the local industry and are prepared for BIM submission to-date by going through a series of pilot runs with the authority. The accepted file format may be expanded when new BIM vendor(s) has met the requirements and ready for local BIM submission. Copyright © 2010 Building and Construction Authority. All Rights Reserved. 2 BIM Submission Guideline for Architectural Discipline CORENET Environment: 1 Collect Submission Template from 4 Submission to Agencies P CORENET BIM Team P (i) ONE BIM (.rvt or .pla) + DWF/ PDF; or E E T Eg.: Revit template (.rte); or T (ii) ONE DWF/ PDF S ArchiCAD template (.tpl) S **Refer to Table 1 BIM Environment: 2 Design, Model & Customise Views P Follow submission requirements E T S 3 Pre-check & Save File P Save native file & export views to DWF/ E T PDF S Figure 1 Schematic diagram showing the steps in preparing the 3D CAD model for submission 2.2. Model Scale All 3D CAD models or BIM submitted for approval have to be drawn in real size as built (1:1) in metric scale. 2.3. Model Orientation and Site Configuration The site, building model or its adjacent buildings should be drawn in the real orientation or spatial coordinate system and with reference to Singapore Standard Datum (>100M), rather than project reference level at zero ground. 2.4. Standard Naming of File and Drawing Views File naming convention below (as modified from SS CP83 Part 3) should be used for all project files submitted: Sample: Project ID Author Zone Version User-defined M L P 1 _ A - 0 1 _ A - Table 2 Naming convention for each 3D model or BIM file submitted Name of Field Indicators Description Project Identification User defined field for the project Author A- Architect C- Civil engineer E- Electrical engineer L- Land surveyor M- Mechanical engineer Copyright © 2010 Building and Construction Authority. All Rights Reserved. 3 BIM Submission Guideline for Architectural Discipline N- Equipment supplier S- Structural engineer T- Telecommunication/ Signal engineer V- Other disciplines X- Contractor Zone (or Block) NN where, N: zone or block number e.g.: 01 for Block 1 A1 for Zone A1 -- For all blocks Version (Revision/ A- 1st submission Submission) B- 2nd submission C- 3rd submission User-defined (Optional) User defined code for in-house applications (optional field) Within each DWF/PDF or BIM model (either RVT or PLA) submitted to the regulatory agencies, all its related drawing views (plans, elevations, sections and 3D views) and layouts (contain only data information such as qualified person’s declarations and schedules) should follow the naming convention below: Note: Follow the submission template provided and it should give you a guide to begin. Sample: Agency Type of View View Name ST B C A - _ F P _ 1 S T O R E Y Table 3 Naming convention for each drawing view Name of Field Indicators Description Agency BCA Building and Construction Authority URA Urban Redevelopment Authority CBPU Central Building Plan Unit PUB Public Utility Board FSSD Fire Safety and Shelter Department NParks National Parks Board LTA Land Transport Authority HDB Housing and Development Board Type of View SP Site Plan FP Floor Plan FE Elevation FX Section DT Details 3D 3D View LV Layout View (should contain only data information, e.g.: QP’s declarations and schedules) View Name 1ST STOREY; or Copyright © 2010 Building and Construction Authority. All Rights Reserved. 4 BIM Submission Guideline for Architectural Discipline 2ND STOREY; or 3RD STOREY; or NTH STOREY; or where, N: Storey’s number LOWER ROOF; or ROOF MEZZANINE N where, N: Mezzanine’s number BASEMENT N where, N: Basement’s number ELEVATION N or N ELEVATION where, N: Directions (e.g.: East, West, North, South; or 1, 2, 3, 4) SECTION N where, N: Section’s number ARCHITECT’S DECLARATION; or ENGINEER’S DECLARATION; or QP’S DECLARATION SUMMARY OF GFA; or SUMMARY OF INCENTIVE GFA; or SUMMARY OF X Where, X: Schedule’s Name 2.5. Annotations and Dimensions Except for 3D model view, all other submitted views such as plans, elevations and sections should be indicated clearly with the necessary annotations, dimensions, scalebar and north point, as specified by the respective regulatory agency in Appendix A. Within each of the model view, QPs are also required to include the related name of view, as shown in Figure 2. Figure 2 Sample of new erection project with name of plan indicated at the bottom 2.6. Last Saved Model or Last Saved View Copyright © 2010 Building and Construction Authority. All Rights Reserved. 5

Description:
C-2 Users of Graphisoft ArchiCAD and Other 3D Modelling Tools .. 84 .. L-. Land surveyor. M-. Mechanical engineer. Collect Submission Template from .. For development with storey/staircase storey shelters, the following.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.