ebook img

Appendix A - Engineering PDF

441 Pages·2017·30.94 MB·English
by  
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview Appendix A - Engineering

Appendix A Engineering Appendix APPENDIX A ENGINEERING APPENDIX Post Authorization Change Report March 2018 Appendix A Engineering Appendix This page intentionally left blank. Post Authorization Change Report March 2018 Appendix A Engineering Appendix TABLE OF CONTENTS A.0 ENGINEERING DESIGN APPENDIX ............................................................................................... A.0-1 A.1 TENTATIVELY SELECTED PLAN .................................................................................................... A.1-1 A.2 STATUS OF ENGINEERING DESIGN ACTIVITIES AND ANALYSES.................................................. A.2-1 A.2.1 LEVEL OF DESIGN EFFORTS .................................................................................................... A.2-1 A.2.2 RECOMMENDATION FOR DESIGN COMPLETION .................................................................. A.2-1 A.3 GENERAL CONSTRUCTION PROCEDURES DISCUSSION .............................................................. A.3-1 A.3.1 GENERAL CONSTRUCTION RECOMMENDATIONS ................................................................. A.3-1 A.3.2 CONSTRUCTION CONTRACTS AND SCHEDULE ...................................................................... A.3-1 A.3.3 CONSTRUCTION SEQUENCING AND STAGING ...................................................................... A.3-1 A.3.3.1 General .......................................................................................................................... A.3-1 A.3.3.2 Access ............................................................................................................................ A.3-1 A.3.3.3 STA, Reservoir and Canal Embankments ....................................................................... A.3-2 A.3.3.4 Pump Station ................................................................................................................. A.3-3 A.3.3.5 Control Structures ......................................................................................................... A.3-3 A.3.3.6 Agricultural Operations ................................................................................................. A.3-3 A.3.3.7 Staging ........................................................................................................................... A.3-3 A.3.4 DEMOLITION AND DISPOSAL ................................................................................................. A.3-4 A.3.5 OTHER PROJECTS AFFECTING CONSTRUCTION ..................................................................... A.3-4 A.4 GENERAL DESIGN REQUIREMENTS AND CRITERIA ..................................................................... A.4-1 A.4.1 PROJECT LIMITS AND SITE DATUM ........................................................................................ A.4-1 A.4.2 SERVICE LIFE .......................................................................................................................... A.4-1 A.4.3 UNITS ..................................................................................................................................... A.4-1 A.4.4 CODES AND STANDARDS ....................................................................................................... A.4-1 A.4.4.1 General .......................................................................................................................... A.4-1 A.4.4.2 Site Work Design Criteria .............................................................................................. A.4-2 A.4.4.3 Geotechnical Design Criteria ......................................................................................... A.4-2 A.4.4.4 Architectural Design Criteria ......................................................................................... A.4-3 A.4.4.5 Structural Design Criteria .............................................................................................. A.4-3 A.4.4.6 Special Mechanical Equipment Design Criteria ............................................................. A.4-4 A.4.4.7 HVAC, Plumbing and Fire Suppression .......................................................................... A.4-6 A.4.4.8 Fire Protection and Detection Design Criteria ............................................................... A.4-6 A.4.4.9 Electrical Design Criteria ................................................................................................ A.4-7 A.4.4.10 Instrumentation and Controls Design Criteria .............................................................. A.4-7 A.4.4.11 Telemetry System Design Criteria ................................................................................. A.4-8 A.4.4.12 Design Criteria Memoranda .......................................................................................... A.4-9 A.5 HYDROLOGY ................................................................................................................................ A.5-1 A.5.1 HAZARD CLASSIFICATION AND EMERGENCY EVACUATION REQUIREMENTS ....................... A.5-1 A.5.2 DESIGN STORMS AND FLOODS .............................................................................................. A.5-1 A.5.2.1 Design Case 1: 100-Year Wind with Probable Maximum Precipitation ........................ A.5-1 A.5.2.2 Design Case 2: Category Five Hurricane with 100-Year storm ...................................... A.5-1 A.5.2.3 Design Case 3: Probable Maximum Wind (200 mph) .................................................... A.5-2 A.5.2.4 Design Case 4: Storm Specific Wind and Precipitation .................................................. A.5-2 A.5.2.5 Summary ........................................................................................................................ A.5-2 A.5.3 A-2 RESERVOIR INFLOWS AND OUTFLOWS ........................................................................... A.5-3 A.5.3.1 Inflow Design Storm ...................................................................................................... A.5-3 Post Authorization Change Report March 2018 A-iii Appendix A Engineering Appendix A.5.3.2 Routing of Flood Flows .................................................................................................. A.5-3 A.5.3.3 Reservoir Discharges ..................................................................................................... A.5-4 A.5.4 WAVE AND OVERTOPPING ANALYSIS .................................................................................... A.5-4 A.5.4.1 Embankment Characteristics ......................................................................................... A.5-4 A.5.4.2 Wave Characteristics ..................................................................................................... A.5-6 A.5.4.3 Wind Setup .................................................................................................................... A.5-6 A.5.4.4 Overtopping Analysis ..................................................................................................... A.5-7 A.5.4.5 Findings and Recommendations ................................................................................. A.5-10 A.5.5 REFERENCES......................................................................................................................... A.5-11 A.6 HYDRAULIC DESIGN .................................................................................................................... A.6-1 A.6.1 INTRODUCTION ..................................................................................................................... A.6-1 A.6.2 GENERAL RESERVOIR DESIGN GUIDELINES ........................................................................... A.6-2 A.6.3 A-2 Reservoir and A-2 STA Water Control Structures ........................................................... A.6-2 A.6.3.1 Overflow Weir SW-1 ...................................................................................................... A.6-2 A.6.3.2 Gated Culvert C-1 .......................................................................................................... A.6-3 A.6.3.3 Gated Culvert C-10 ........................................................................................................ A.6-4 A.6.3.4 Gated Culvert C-9 .......................................................................................................... A.6-5 A.6.3.5 Gated Culverts C-3 and C-4 ........................................................................................... A.6-8 A.6.3.6 Gated Culverts C-5 and C-6 ........................................................................................... A.6-9 A.6.3.7 Gated Culverts C-7 and C-8 ......................................................................................... A.6-10 A.6.3.8 Un-Gated Culvert C-2 .................................................................................................. A.6-11 A.6.3.9 STA Design Storm Simulation ...................................................................................... A.6-12 A.6.4 A-2 RESERVOIR INFLOW OUTFLOW CANAL & STA 3/4 INFLOW CANAL STRUCTURES ........ A.6-13 A.6.4.1 Gated Spillway SW-2 and SW-3 ................................................................................... A.6-13 A.6.4.2 Gated Spillway SW-4 ................................................................................................... A.6-14 A.6.5 PUMP STATION P-1 .............................................................................................................. A.6-15 A.6.6 A-2 RESERVOIR INFLOW-OUTFLOW CANAL AND A-2 STA CANALS ..................................... A.6-16 A.6.6.1 A-2 Reservoir Inflow Outflow Canal ............................................................................ A.6-16 A.6.6.2 A-2 STA Distribution and Collection Canals ................................................................. A.6-18 A.6.6.3 A-2 STA Discharge Canal .............................................................................................. A.6-18 A.6.7 REFERENCES......................................................................................................................... A.6-19 A.7 SUBSURFACE CONSIDERATIONS FOR CONSTRUCTION .............................................................. A.7-1 A.7.1 Geotechnical Exploration ...................................................................................................... A.7-1 A.7.2 Stratigraphy ........................................................................................................................... A.7-3 A.7.3 Laboratory Test Results ......................................................................................................... A.7-3 A.7.4 Hydrostratigraphy.................................................................................................................. A.7-4 A.7.5 Seismicity ............................................................................................................................... A.7-4 A.7.6 Borrow ................................................................................................................................... A.7-5 A.7.7 Excavations ............................................................................................................................ A.7-5 A.7.8 Crushing/Material Processing ............................................................................................... A.7-5 A.7.9 Design Parameters................................................................................................................. A.7-6 A.7.10 Additional Geotechnical Investigations ................................................................................. A.7-6 A.8 EMBANKMENT/DAM DESIGN ..................................................................................................... A.8-1 A.8.1 General .................................................................................................................................. A.8-1 A.8.2 Conceptual Dam Embankment .............................................................................................. A.8-1 A.8.2.1 Embankment Description .............................................................................................. A.8-1 A.8.3 Design Criteria ....................................................................................................................... A.8-4 A.8.3.1 Sources .......................................................................................................................... A.8-4 Post Authorization Change Report March 2018 A-iv Appendix A Engineering Appendix A.8.3.2 Embankment Slope Stability Factors of Safety .............................................................. A.8-4 A.8.3.3 Water Levels .................................................................................................................. A.8-4 A.8.3.4 Seismic Loading ............................................................................................................. A.8-5 A.8.4 Embankment/Dam Materials ................................................................................................ A.8-5 A.8.4.1 General .......................................................................................................................... A.8-5 A.8.4.2 Subsurface Profile .......................................................................................................... A.8-5 A.8.4.3 Embankment Materials ................................................................................................. A.8-5 A.8.5 Seepage Control .................................................................................................................... A.8-8 A.8.5.1 General .......................................................................................................................... A.8-8 A.8.5.2 Seepage Model Parameters .......................................................................................... A.8-8 A.8.5.3 Embankment Seepage ................................................................................................... A.8-8 A.8.6 Stability ................................................................................................................................ A.8-23 A.8.6.1 General ........................................................................................................................ A.8-23 A.8.6.2 Material Parameters .................................................................................................... A.8-23 A.8.6.3 Embankment Slope Stability........................................................................................ A.8-23 A.8.7 Erosion Protection ............................................................................................................... A.8-38 A.8.7.1 General ........................................................................................................................ A.8-38 A.8.7.2 Roller Compacted Concrete (RCC) ............................................................................... A.8-38 A.8.8 Foundations ......................................................................................................................... A.8-38 A.8.9 Settlement ........................................................................................................................... A.8-38 A.8.9.1 Foundation Settlement ............................................................................................... A.8-38 A.8.9.2 Embankment Dam ....................................................................................................... A.8-39 A.8.10 Borrow ................................................................................................................................. A.8-39 A.8.10.1 General ........................................................................................................................ A.8-39 A.8.10.2 Embankment ............................................................................................................... A.8-39 A.8.11 Embankment Sections Evaluation ....................................................................................... A.8-40 A.8.11.1 Typical Dam Embankment Sections ............................................................................ A.8-40 A.9 RESERVOIR SEEPAGE .................................................................................................................. A.9-1 A.9.1 INTRODUCTION ..................................................................................................................... A.9-1 A.9.2 GROUNDWATER / SURFACE WATER MODEL DEVELOPMENT............................................... A.9-2 A.9.2.1 Groundwater Model Boundary ..................................................................................... A.9-2 A.9.2.2 Groundwater Model Boundary Conditions ................................................................... A.9-3 A.9.2.3 Groundwater Model Parameters .................................................................................. A.9-3 A.9.2.4 Surface Water Model Parameters ................................................................................. A.9-4 A.9.2.5 Comparison of the 3D Groundwater Model with the 2D Groundwater Models .......... A.9-4 A.9.3 Groundwater Model Simulations and Seepage Management .............................................. A.9-7 A.9.3.1 Existing Conditions Model ............................................................................................. A.9-7 A.9.3.2 Proposed Project with Passive Seepage Management ................................................. A.9-7 A.9.3.3 Proposed Project Alternatives with Active Seepage Management .............................. A.9-9 A.10 STRUCTURAL DESIGN CRITERIA ................................................................................................ A.10-1 A.10.1 APPLICABLE CODES AND STANDARDS ................................................................................. A.10-1 A.10.2 DESIGN STRESSES ................................................................................................................ A.10-1 A.10.2.1 Minimum Concrete Compressive Strength (Unconfined) ........................................... A.10-1 A.10.2.2 Reinforcing Steel .......................................................................................................... A.10-1 A.10.2.3 Structural Steel ............................................................................................................ A.10-1 A.10.2.4 Masonry ....................................................................................................................... A.10-1 A.10.3 LOADING CRITERIA .............................................................................................................. A.10-1 A.10.3.1 Dead Loads .................................................................................................................. A.10-1 Post Authorization Change Report March 2018 A-v Appendix A Engineering Appendix A.10.3.2 Live Loads, per Major Pumping Station Engineering Guidelines ................................. A.10-2 A.10.3.3 Lateral Loads ................................................................................................................ A.10-2 A.10.3.4 Snow Loads - Not Applicable ....................................................................................... A.10-3 A.10.3.5 Seismic Loads ............................................................................................................... A.10-3 A.10.3.6 Wind Loads – Pump Station ........................................................................................ A.10-3 A.10.3.7 Wind Loads – Flood Control Elements ........................................................................ A.10-3 A.10.3.8 Flood Load (Hydrostatic + Wave) ................................................................................ A.10-3 A.10.4 HYDRAULIC STRUCTURES AND PUMPING STATION SUBSTRUCTURE ................................. A.10-3 A.10.4.1 Materials of Construction ............................................................................................ A.10-3 A.10.4.2 Design Procedures and Assumptions .......................................................................... A.10-3 A.10.4.3 Design Load Cases ....................................................................................................... A.10-4 A.10.4.4 Service Water Condition .............................................................................................. A.10-5 A.10.4.5 Flood/Overflow Water Condition ................................................................................ A.10-5 A.10.4.6 Seismic Water Condition ............................................................................................. A.10-5 A.10.4.7 Service Soil Condition .................................................................................................. A.10-5 A.10.4.8 Flood Soil Condition ..................................................................................................... A.10-5 A.10.4.9 Steel Hydraulic Structures ........................................................................................... A.10-6 A.10.4.10 Overturning, Sliding and Flotation .............................................................................. A.10-6 A.10.5 BUILDING STRUCTURES ....................................................................................................... A.10-6 A.10.6 INSPECTION REQUIREMENTS .............................................................................................. A.10-6 A.10.7 BRIDGES ............................................................................................................................... A.10-6 A.11 SITE CIVIL DESIGN ..................................................................................................................... A.11-1 A.11.1 PROJECT LAYOUT ................................................................................................................. A.11-1 A.11.2 SITE ACCESS, ROADWAYS AND BRIDGES ............................................................................. A.11-1 A.11.3 STORMWATER CONTROL/SITE DRAINAGE .......................................................................... A.11-1 A.11.3.1 During Construction .................................................................................................... A.11-1 A.11.3.2 Permanent Construction ............................................................................................. A.11-2 A.11.4 UTILITIES .............................................................................................................................. A.11-2 A.11.4.1 Electric Power .............................................................................................................. A.11-2 A.12 MECHANICAL DESIGN ............................................................................................................... A.12-1 A.12.1 INTRODUCTION ................................................................................................................... A.12-1 A.12.2 PUMP STATION .................................................................................................................... A.12-1 A.12.2.1 Design Criteria ............................................................................................................. A.12-1 A.12.2.2 Equipment ................................................................................................................... A.12-4 A.12.2.3 Protection Elevation .................................................................................................... A.12-4 A.12.2.4 Connector Canal Considerations ................................................................................. A.12-5 A.12.2.5 Mechanical Arrangement Considerations ................................................................... A.12-5 A.12.2.6 System Analysis of Pump Station ................................................................................ A.12-5 A.12.2.7 Station Mechanical – Major Equipment and Auxiliary Systems .................................. A.12-9 A.12.2.8 Diesel Engine Drivers ................................................................................................. A.12-13 A.12.2.9 Speed Reducers ......................................................................................................... A.12-19 A.12.2.10 Fuel System................................................................................................................ A.12-24 A.12.2.11 Mechanically Cleaned Trash Racks ............................................................................ A.12-29 A.12.2.12 Discharge Piping and Appurtenances ........................................................................ A.12-29 A.12.2.13 Lubrication Oil System ............................................................................................... A.12-30 A.12.2.14 Vacuum Priming System ............................................................................................ A.12-31 A.12.2.15 Compressed Air System ............................................................................................. A.12-31 A.12.2.16 Backflow and Dewatering Gates and Operators ....................................................... A.12-32 Post Authorization Change Report March 2018 A-vi Appendix A Engineering Appendix A.12.2.17 Station Emergency Power ......................................................................................... A.12-32 A.12.2.18 Stage Monitors .......................................................................................................... A.12-32 A.13 ELECTRICAL DESIGN .................................................................................................................. A.13-1 A.13.1 DESIGN CRITERIA ................................................................................................................. A.13-1 A.13.1.1 Utility Power ................................................................................................................ A.13-1 A.13.1.2 Pump Station Equipment Voltage ............................................................................... A.13-1 A.13.1.3 Pump Station Power Distribution ................................................................................ A.13-1 A.13.1.4 Pump Station Switchgear ............................................................................................ A.13-3 A.13.1.5 Standby Generator Power ........................................................................................... A.13-3 A.13.1.6 Pump Station Building Systems ................................................................................... A.13-5 A.13.1.7 Valve Operators and Controls ..................................................................................... A.13-5 A.13.1.8 Gate Operators and Controls ...................................................................................... A.13-6 A.13.2 PUMP STATION ENGINEERING GUIDELINES ........................................................................ A.13-6 A.14 INSTRUMENTATION AND CONTROLS ....................................................................................... A.14-1 A.14.1 DESIGN CRITERIA ................................................................................................................. A.14-1 A.14.2 A-2 RESERVOIR, A-2 STA AND CANALS ................................................................................ A.14-1 A.14.3 WATER CONTROL FACILITIES ............................................................................................... A.14-1 A.14.4 A-2 RESERVOIR PUMP STATION .......................................................................................... A.14-2 A.14.4.1 Operation .................................................................................................................... A.14-2 A.14.4.2 Diesel Engine Driver Control and Monitoring System ................................................. A.14-2 A.14.4.3 Logic Controller (PLC) .................................................................................................. A.14-2 A.14.4.4 Display Panel ............................................................................................................... A.14-3 A.14.4.5 Converter (J1939/DF1-RS232) ..................................................................................... A.14-3 A.14.4.6 Interface Module (Modbus/RS232) ............................................................................. A.14-3 A.14.4.7 Surge Suppressor ......................................................................................................... A.14-3 A.14.4.8 Vibration Switch .......................................................................................................... A.14-3 A.14.4.9 Temperature Monitors ................................................................................................ A.14-3 A.14.4.10 Liquid Level Gage ......................................................................................................... A.14-3 A.14.4.11 Indicating Level Switches ............................................................................................. A.14-3 A.14.4.12 Monitoring Instrumentation ....................................................................................... A.14-4 A.14.4.13 Station Emergency Power ........................................................................................... A.14-4 A.14.4.14 Stage Monitors ............................................................................................................ A.14-4 A.14.5 TELEMETRY .......................................................................................................................... A.14-4 A.15 ARCHITECTURAL ....................................................................................................................... A.15-1 A.15.1 DESIGN CRITERIA ................................................................................................................. A.15-1 A.15.1.1 Introduction ................................................................................................................. A.15-1 A.15.1.2 Design Requirements .................................................................................................. A.15-1 A.15.2 EXTERIOR ARCHITECTURAL FEATURES ................................................................................ A.15-2 A.15.2.1 Shel ......................................................................................................................... A.15-2 A.15.2.2 Superstructure ............................................................................................................. A.15-2 A.15.2.3 Exterior Enclosure........................................................................................................ A.15-2 A.15.2.4 Roofing ........................................................................................................................ A.15-2 A.15.3 INTERIOR ARCHITECTURAL FEATURES ................................................................................. A.15-2 A.15.3.1 Floor ......................................................................................................................... A.15-2 A.15.3.2 Partitions ..................................................................................................................... A.15-3 A.15.3.3 Interior Doors and Windows ....................................................................................... A.15-3 A.15.3.4 Interior Finishes ........................................................................................................... A.15-3 A.15.3.5 Vertical Circulation ...................................................................................................... A.15-3 Post Authorization Change Report March 2018 A-vii Appendix A Engineering Appendix A.15.4 INTERIOR FIXTURES ............................................................................................................. A.15-4 A.15.4.1 Identifying Devices ...................................................................................................... A.15-4 A.15.4.2 Storage Fixtures ........................................................................................................... A.15-4 A.15.4.3 Accessory Fixtures ....................................................................................................... A.15-4 A.15.4.4 Interior Fixtures ........................................................................................................... A.15-4 A.16 HVAC, PLUMBING AND FIRE SUPPRESSION SYSTEMS .............................................................. A.16-1 A.16.1 DESIGN CRITERIA ................................................................................................................. A.16-1 A.16.2 HVAC .................................................................................................................................... A.16-1 A.16.2.1 Heating Systems .......................................................................................................... A.16-1 A.16.2.2 Ventilation Systems ..................................................................................................... A.16-1 A.16.2.3 Air Conditioning Systems ............................................................................................. A.16-2 A.16.3 POTABLE WATER.................................................................................................................. A.16-3 A.16.4 FRESH WATER SUPPLY SYSTEM ........................................................................................... A.16-3 A.16.5 COOLING WATER SYSTEM ................................................................................................... A.16-3 A.16.6 SANITARY SYSTEM ............................................................................................................... A.16-3 A.16.7 STORMWATER SYSTEM ....................................................................................................... A.16-3 A.16.8 FIRE SUPPRESSION SYSTEM ................................................................................................. A.16-4 A.17 ACCESS AND SECURITY ............................................................................................................. A.17-1 A.17.1 ACCESS ................................................................................................................................. A.17-1 A.17.2 SECURITY ............................................................................................................................. A.17-1 A.17.2.1 Fences and Gates ......................................................................................................... A.17-1 A.17.2.2 Site Monitoring at A-2 Reservoir Pump Station .......................................................... A.17-1 A.17.2.3 Building Access at A-2 Reservoir Pump Station ........................................................... A.17-1 A.18 EMERGENCY ACTION PLAN ...................................................................................................... A.18-1 ANNEXES A-1 – Hydraulic Design • Preliminary Conveyance Assessment for Lake Okeechobee Releases through the Miami & NNR Canals Report • Pump Station Hydraulic Calculations A-2 – Hydrologic Modeling • A-2 Reservoir Wave and Overtopping Analysis Report • EAA Storage Reservoir Project Baseline Runs Model Documentation Report • EAA Storage Reservoir Project Final Array of Alternatives Model Documentation Report • EAA Storage Reservoir Project C240 Tentatively Selected Plan Model Documentation Report B-1 – (PLACE HOLDER – NOT USED) C-1 – Civil Plates • Overall Site Plan for TSP • Earthwork Typical Sections for TSP D-1 – Mechanical Plates (Selected SFWMD Guideline Drawings) • Drawing G-G1 (1 of 4) – Cover Sheet • Drawing G-G1 (2 of 4) – Sheet Index • Drawing G-G1 (3 of 4) – Standard Abbreviations • Drawing G-G1 (4 of 4) – Design Requirements • Drawing G-S1 (1 of 2) – Water Control Struct. w/ Vert. Lift Roller Gate Section & Elevation Post Authorization Change Report March 2018 A-viii Appendix A Engineering Appendix • Drawing G-S1 (2 of 2) – Water Control Struct. w/ Vert. Lift Roller Gate Plan • Drawing G-S7 (1 of 2) – Control Building w/ Generator Plan • Drawing G-S7 (2 of 2) – Control Building w/ Generator Elevations • Drawing G-S13 (2 of 2) – Gated Box Culvert Double Barrel Arrangement G-1 – Geological Investigations • Boring Logs Referenced in Appendix A • Laboratory Data from Geotechnical Reports Referenced in Appendix A LIST OF TABLES Table A.1-1. Summary of TSP Features ................................................................................................................ A.1-1 Table A.5.2-1. Wind and Precipitation Design Conditions .................................................................................... A.5-3 Table A.5.4-1. A-2 Reservoir Wave Prediction Results .......................................................................................... A.5-6 Table A.5.4-2. Summary of Calculated Wind Setup .............................................................................................. A.5-7 Table A.5.4-3. Design Water Levels and Wave Conditions Adopted for the Overtopping Analysis ............... A.5-8 Table A.5.4-4. Results of Overtopping Analysis ...................................................................................................... A.5-9 Table A.5.4-5. Summary of Overtopping Probability and Maximum Overtopping Volume for a Single Wave (assuming 3 hr storm duration) .....................................................................................................A.5-10 Table A.6.3-1. A-2 Reservoir Gated Box Culverts Structure Geometry ............................................................... A.6-6 Table A.6.3-2. A-2 Reservoir Gated Box Culverts Simulated Flow and Stage Conditions ................................ A.6-7 Table A.6.3-3. STA Gated Box Culverts C-3 and C-4 Structure Geometry .......................................................... A.6-9 Table A.6.3-4. STA Gated Box Culverts C-3 and C-4 Simulated Flow and Stage Conditions ............................ A.6-9 Table A.6.3-5. STA Gated Box Culverts C-5 and C-6 Structure Geometry ........................................................A.6-10 Table A.6.3-6 STA Gated Box Culverts C-5 and C-6 Simulated Flow and Stage Conditions ..........................A.6-10 Table A.6.3-7. STA Gated Box Culverts C-7 and C-8 Structure Geometry ........................................................A.6-11 Table A.6.3-8. STA Gated Box Culverts C-7 and C-8 Simulated Flow and Stage Conditions ..........................A.6-11 Table A.6.3-9. STA Un-Gated Box Culverts C-2 Structure Geometry ................................................................A.6-12 Table A.6.3-10. STA Un-Gated Box Culverts C-2 Simulated Flow and Stage Conditions ..................................A.6-12 Table A.6.4-1. Gated Spillways SW-2 and SW-3 Structure Geometry ..............................................................A.6-14 Table A.6.4-2. Gated Spillways SW-2 and SW-3 Simulated Flow and Stage Conditions ................................A.6-14 Table A.6.4-3. Gated Spillway SW-4 Structure Geometry ..................................................................................A.6-15 Table A.6.4-4. Gated Spillway SW-4 Simulated Flow and Stage Conditions ....................................................A.6-15 Table A.6.6-1. A-2 Reservoir Inflow Outflow-Canal Calculated Flow Capacity ................................................A.6-16 Table A.6.6-2. A-2 STA Distribution and Collection Canals Calculated Flow Capacity ....................................A.6-18 Table A.6.6-3. A-2 STA Discharge Canal Calculated Flow Capacity ....................................................................A.6-18 Table A.8.4-1. Availability of Construction Materials ............................................................................................ A.8-5 Table A.8.5-1. Seepage and Stability Analysis Parameters ................................................................................... A.8-8 Table A.8.5-2. Factors of Safety against Soil Heave/Piping ................................................................................... A.8-9 Table A.8.5-3. Computed Seepage from the Reservoir ........................................................................................ A.8-9 Table A.8.6-1. Results of Stability Analysis for Cross Section K(L) ......................................................................A.8-37 Table A.8.6-2. Results of Stability Analysis for Cross Section F(L).......................................................................A.8-37 Table A.8.6-3. Results of Stability Analysis for Cross Section J-1(L). ...................................................................A.8-37 Table A.8.6-4. Results of Stability Analysis for Cross Section L(L) .......................................................................A.8-38 Table A.9.2-1. Groundwater Model Parameters ................................................................................................... A.9-3 Post Authorization Change Report March 2018 A-ix Appendix A Engineering Appendix Table A.9.2-2. Groundwater Model Parameters ................................................................................................... A.9-4 Table A.9.2-3. Comparison of Seepage Rates between 2D and 3D Models ...................................................... A.9-5 Table A.9.3-1. Simulated Fluxes out of the External Boundary in Existing and Proposed Conditions ............ A.9-7 Table A.9.3-2. Simulated Seepage Flow Rates for Seepage Flow Out of Impoundments for Proposed Project with Passive Seepage Management .............................................................................................. A.9-9 Table A.9.3-3. Proposed Project Alternatives for Active Seepage Management ............................................A.9-10 Table A.9.3-4. Simulated Seepage Flows in Proposed Project Alternatives Evaluated ..................................A.9-10 Table A.10.4-1. Overturning, Sliding, and Flotation Factors .................................................................................A.10-6 Table A.11-1. A-2 Reservoir Stage-Storage ..........................................................................................................A.11-1 Table A.12.2-1. Pump Station Canal and Reservoir Conditions ...........................................................................A.12-9 Table A.12.2-2. Pump Static Head ............................................................................................................................A.12-9 Table A.12.2-3. Fitting Friction Factors (K) ...............................................................................................................A.12-9 Table A.12.2-4. Friction Losses at Maximum Capacity ....................................................................................... A.12-10 Table A.12.2-5. Pump Design Capacity at Rated Conditions (Running) ........................................................... A.12-10 Table A.12.2-6. Pump Design Capacity at Rated Conditions (Starting) ............................................................ A.12-11 Table A.12.2-7. Pump Material Specifications ..................................................................................................... A.12-16 Table A.12.2-8. Pipe Wall Thickness ...................................................................................................................... A.12-33 Table A.15.1-1. Exceptions to the Building Service Life Span ...............................................................................A.15-1 Table A.16.1-1. Project Site Design Criteria .............................................................................................................A.16-1 Table A.16.2-1. Indoor Design Criteria for Project .................................................................................................A.16-2 LIST OF FIGURES Figure A.1-1. Overall Site Plan of TSP ..................................................................................................................... A.1-5 Figure A.5.4-1 Typical Cross Section for the A-2 Reservoir ................................................................................... A.5-5 Figure A.6.1-1. EAA Reservoir Schematic ................................................................................................................. A.6-1 Figure A.6.3-1. Simulated Flow and Headwater Stage at S-1 for Weir Lengths 13.5 and 15.2 Feet ................ A.6-3 Figure A.6.3-2. STA Simulated Stages During 100-Year Design Storm ...............................................................A.6-13 Figure A.6.6-1. Simulated Stages in the A-2 Inflow-Outflow Canal During Maximum Pumping at P-1 ........A.6-17 Figure A.6.6-2. Simulated Flows (cfs) in the A-2 Inflow-Outflow Canal for P-1 Location at mile 4.6 .............A.6-17 Figure A.6.6-3. Simulated Flows (cfs) in the A-2 Inflow-Outflow Canal for P-1 Location at mile 6.2 .............A.6-17 Figure A.6.6-4. Simulated Flows (cfs) in the A-2 Inflow-Outflow Canal for P-1 Location at mile 9.6 .............A.6-18 Figure A.7.1-1. Boring Locations ................................................................................................................................ A.7-2 Figure A.8.2-1. Location of Typical Cross Sections .................................................................................................. A.8-2 Figure A.8.2-2. Typical Dam Embankment Section - Cross Section K(L) .............................................................. A.8-3 Figure A.8.4-1. Location of Soil Profile across A-1 and A-2 Sites ........................................................................... A.8-7 Figure A.8.5-1. Steady State Seepage with Normal Pool - Cross Section K(L) ...................................................A.8-11 Figure A.8.5-2. Steady Seepage with Water Level at Surcharge Pool - Cross Section K(L) ..............................A.8-11 Figure A.8.5-3. Critical Section for Rapid Drawdown - Cross Section K(L)..........................................................A.8-13 Figure A.8.5-4. Steady State Seepage with Normal Pool - Cross Section F(L) ...................................................A.8-13 Figure A.8.5-5. Steady Seepage with Water Level at Surcharge Pool - Cross Section F(L) ..............................A.8-15 Figure A.8.5-7. Steady State Seepage with Normal Pool - Cross Section J-1(L) .................................................A.8-17 Figure A.8.5-8. Steady Seepage with Water Level at Surcharge Pool - Cross Section J-1(L)............................A.8-17 Post Authorization Change Report March 2018 A-x

Description:
A.12-30. A.12.2.14 Vacuum Priming System . Laboratory Data from Geotechnical Reports Referenced in Appendix A. LIST OF Manufacturers Standardization Society of Valve and Fitting Industry (MSS) An ammeter and voltmeter shall be provided on the charger to indicate charging rate and.
See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.