ebook img

20-05 PDF

0.7 MB·English
Save to my drive
Quick download
Download
Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.

Preview 20-05

BID DOCUMENTS AND SPECIFICATIONS FOR: BID# 20-05 MAINTENANCE SERVICE FOR TRAFFIC SIGNALS, TRAFFIC CONTROL DEVICES AND STREET LIGHTS Arlington, Massachusetts Prepared for: Department of Public Works Town of Arlington, Massachusetts SEALED BIDS shall be received: Date: Thursday, February 6, 2020 Time: 10:00 AM Place: Office of the Purchasing Agent 730 Massachusetts Avenue Arlington, MA 02476 TOWN OF ARLINGTON MASSACHUSETTS INVITATION TO BID # 20-05 MAINTENANCE SERVICE FOR TRAFFIC SIGNALS, TRAFFIC CONTROL DEVICES AND STREET LIGHTS Sealed bids are invited and will be received by the Town Manager, Town of Arlington, Massachusetts, until 10:00 A.M., Thursday, February 6, 2020 at the Office of the Purchasing Agent, Town Hall, Arlington, Massachusetts 02476, at which time and place they will be publicly opened and read. A BID DEPOSIT IN THE FORM OF CASH, CERTIFIED CHECK, OR TREASURER'S CHECK, shall accompany every bid. The amount of such bid deposit shall be FIVE PERCENT (5%) of the value of the bid. All bids must be in sealed envelopes plainly marked: #20-05 MAINTENANCE SERVICE FOR TRAFFIC SIGNALS, TRAFFIC CONTROL DEVICES AND STREET LIGHTS The conditions of employment as set forth in Sections 26 to 27D and 27F of Chapter 149 of the General Laws, as amended, shall prevail in the execution of the work under this contract. Attention is called to the fact that minimum wage rates and health and welfare and pension fund contributions are established for this contract and are a part of the specifications. Work under this contract shall be governed byM.G.L.Ch.30, Sec.39M. It is the intention of the Owner to award the Contract to the lowest qualified responsive bidder. An increase or decrease in the quantity of work shall not be regarded as a sufficient ground for an increase in the unit prices. To receive consideration, bids must be in the hands of the Purchasing Agent or his authorized representative not later than the day and hour above mentioned. For further information relative to this bid, please confer with Domenic R. Lanzillotti, Director, Purchasing Department, Town Hall, 703 Mass Avenue, Arlington, Massachusetts, 02476. OSHA Construction Training Required: As of July 1, 2006, under M.G.L. – Chapter 30, Section 39s, any person, submitting a bid for, or signing a contract to work on, the construction, reconstruction, alteration, remodeling or repair of any public work by the Commonwealth of Massachusetts/Town of Arlington, and estimated by the awarding Authority to cost more than $10,000, shall certify on the Bid or Contract, under penalty of perjury, that all employees to be employed at the work will have successfully completed a course in construction safety and health approved by the United States Occupational Safety and Health Administration that is at least 10 hours in duration The Town Manager reserves the right to cancel any invitation for bids, to reject in whole or in part any and all bids, when it is deemed in the best interest of the Town of Arlington to do so. TOWN OF ARLINGTON ------------------------------------- Adam Chapdelaine Town Manager Date: January 22, 2020 I INSTRUCTION TO BIDDERS 1. Receipt of Bids The Town may consider informal any bid not prepared and submitted in accordance with the provisions hereof and may waive any informality in or reject any bids. Any bid may be withdrawn before the time for the opening of bids. Any bid received after the time and date specified shall not be considered. No bidder may withdraw his/her bid for a period of 30 days, excluding Saturdays, Sundays, and legal holidays after actual date of the opening thereof. 2. Preparation of Bid Each bid shall be submitted on the forms attached to these documents. The bid forms may be removed and submitted separately from the other documents. All blank spaces for bid prices must be filled in with the unit price for the item or the lump sum for which the proposal is made. Bidders must bid on each item. All entries in the entire proposal must be made clearly, and prices written in both words and figures in the spaces provided. Each bid must be in a sealed envelope addressed to the Office of the Purchasing Agent, 730 Massachusetts Avenue, Arlington, Massachusetts, 02476; and bearing on the outside the name of the bidder, his/her address, the name of the project for which the bid is submitted, and the notation #20-05 MAINTENANCE SERVICE FOR TRAFFIC SIGNALS, TRAFFIC CONTROL DEVICES AND STREET LIGHTS. 3. Bid Security Every bid submitted by contractors shall be accompanied by a bid deposit in the form of cash, certified check, treasurer's or cashier's check, or a bid bond issued by a responsible bank or trust company and made payable to the Town of Arlington. The amount of the bid deposit shall be 5% of the amount of the bid. All security except those of the three lowest responsible and eligible bidders will be returned within ten days, Saturdays, Sundays, and legal holidays excluded, after opening of the bid. All bid securities will be returned on the execution of the contract or if no award is made within 30 days, excluding Saturdays, Sundays, and legal holidays, after the actual date of the opening thereof, unless forfeited under the conditions herein stipulated. In case a party to whom a contract is awarded shall fail or neglect to execute the contract and furnish the satisfactory bond in the time specified, the Town may determine the bidder has abandoned the contract and thereupon the proposal and acceptance shall be null and void, and the bid security accompanying the proposal shall be forfeited to the Town as liquidation damages for such failure or neglect and indemnify the Town for any loss which may be sustained by failure of the bidder to execute the contract and furnish the bonds as aforesaid, provided that, in case of death, disability, or other unforeseen circumstances affecting the bidder, such bid security may be returned to him/her. After execution of the contract and acceptance of the bonds by the Town, the bid security accompanying the proposal of the successful bidder will be returned. 4. Time of Completion The bidder must agree to commence work within five (5) business days from the date of signing the contract and to fully complete the project within the time specified within the Special Provisions section of this document. 5. Performance and Labor Material Bonds N/A 6. Laws and Regulations The bidder's attention is directed to the fact that all applicable Laws, Town of Arlington Bylaws, municipal ordinances, and the rules and regulations of all authorities having jurisdiction over construction of the project shall apply to the contract throughout, and they shall be deemed to be included in the contract the same as though herein written out in full. 7. Ability and Experience a. Bidder must presently and primarily be engaged in the business of maintaining, servicing, and installing traffic control signals/devices and street lighting as part of such business, is presently providing emergency call servicing of traffic signals/lighting devices on a regular basis with twenty-four (24) hour per day, three-hundred and sixty- five (365) day per year service. b. Bidder shall have a minimum of five (5) years experience installing and servicing traffic controls signals and devices and have satisfactorily completed/performed five (5) jobs within that time of similar size and scope. c. Bidder will have at least two (2) full time employees that have a minimum of ten (10) years’ experience maintaining traffic signal and street lighting equipment. d. Bidder will have at least two (2) full time employees that have a minimum of ten (10) years experience with connecting hard wire interconnect cabling for traffic signal systems and operations. e. Bidder will have at least two (2) full time employees that are IMSA Traffic Signal Senior Field Technician Level III. f. Bidder will have at least two (2) full time Massachusetts Licensed Electricians employed with two (2) available for emergency repairs 24 hours a day. g. The Contractor must submit with his bid proposal a list of five (5) jobs which he has successfully completed/performed giving the name and the address of these projects so they can be investigated prior to the award of the contract. The Owner may make such investigations as he deems necessary, and the bidder shall furnish to the Owner, under oath if so required, all such information and data for this purpose as the Owner may request. 8. Withdrawal of Bids Upon proper written request and identification, Bids may be withdrawn only as follows: a. At any time before the designated time for the opening of Bids. b. Death or serious injury of a principal. c. With the written approval of the Town of Arlington Office of the Purchasing Director. d. At any time after the expiration of the period during which withdrawal is prohibited provided the bid has not been accepted by the Town. 9. Execution of Contract The party to whom the contract is awarded shall be required to execute the contract and furnish the bonds duly executed with a satisfactory surety company within five days, excluding Saturdays, Sundays, and legal holidays, of the date of the mailing of the notice to the bidder according to the address given by him/her, that the contract is ready for execution. 10. Obligation of Bidder At the time of the opening of bids, each bidder shall be presumed to have read and to be thoroughly familiar with the contract documents. The failure or omission of any bidder to receive or examine any form, instrument, or documents shall in no way relieve any bidder from the obligation in respect to his bid. 11. Omissions, Discrepancies, Interpretations and Addenda Should a bidder find discrepancies in, or omissions from, the drawings or contract documents, or should he/she have questions as to the interpretation of the plans or contract documents he/she shall submit such in writing to the Director of Purchasing at least five (5) days before the date herein set for the opening of bids. An interpretation will be mailed by certified mail to prospective bidders at the addresses given by them on or about two (2) days before the opening of bids. Signed copies of all addenda shall be included with the bid; omission of the signed addendum shall be cause for rejection of the bid. 12. Record of Address Prospective bidders shall at the time plans and specifications are secured place on file with the Director of Purchasing their address, and are required to make any changes necessary to insure that the record is accurate, complete, and up to date. 13. Massachusetts Sales and Use Tax Materials purchased for permanent installation in the work will be exempt from the Massachusetts Sales and Use tax. Each bidder shall consider this exemption in calculating his/her bid for the work. 14. State Tax Affidavit Prospective bidders are required to certify that all state tax returns have been filed and all state taxes have been paid in order to be eligible to enter into a contract with the Town on this project. The included form is to be used for this purpose and is to be completed and returned as part of the bid and proposal. 15. Minimum Wage Rates Prevailing rates for wages for work performed under this Contract will be as predetermined by the Commissioner of Labor and Industries of the Commonwealth of Massachusetts in accordance with the provisions of Sections 26 to 27D, inclusive, of c.149 of M.G.L. A schedule of the prevailing wages is included in the Minimum Wage Rates Section. 16. Sub-bids No sub bids shall be sought in connection with this Contract. 17. Supplemental Information All bidders shall submit the following supplemental information with a fee proposal: a. Name, address and phone number of a minimum of three (3) references that can vouch for the performance of the bidder b. Proof of Liability and Worker’s Compensation Insurance Coverage c. Completed tax attestation form d. Bid deposit II LOCATION OF WORK 1. Work under this contract includes all labor and materials to perform service on all traffic signal, traffic control devices and street lighting in the Town of Arlington as directed by the Arlington Police Department and Engineering Division. TRAFFIC SIGNALS, TRAFFIC CONTROL DEVICES & STREET LIGHTING LOCATIONS Traffic Signals Traffic Signals - continued 1) Broadway & Bates Rd. 28) Summer St. & Brattle St./Symmes Rd. 2) Warren St. & River St. 29) Summer St. & Forest St. 3) Broadway & Cleveland St. 30) Summer St. & Mill St./Cutter Hill Rd. 4) Broadway & Franklin St. 31) Summer St. & Mystic St. 5) Massachusetts Ave. at Franklin St. 32) Summer St. @ Overlook Rd. 6) Broadway & No. Union St./Oxford St. 33) Summer St. & Park Ave. Ext 7) Highland Ave. & Gray St. 34) Eastern Ave - Brackett School 8) Lake St. & Brooks Ave. 9) Mass. Ave. & Appleton St. Flashers, Beacons, DSDS, RRFB 10) Mass. Ave. & Bates Rd./Marion Rd. 35) Jason St. & Gray St. 11) Mass. Ave. & Brattle St. 36) Mass. Ave. & Forest St. 12) Mass. Ave. & Churchill St. 37) Park Ave Ext Peirce School 13) Mass. Ave. & Foster St./Linwood Ave. 38) Forest St. & Clyde Terrace 14) Mass. Ave. & Highland Ave. 39) North Union St.; #87 (Thompson School) 15) Mass. Ave. & Lake St 40) Park Ave. Ext @ Lowell St. 16) Mass. Ave. & Medford St. 41) Mill St @ Bike Path 17) Mass. Ave. & Mill St./Jason St. 18) Mass. Ave. & Park Ave Street Lights and Lighting Fixtures Miscellaneous Lighting Fixtures at 19) Mass. Ave. & Pleasant St./Mystic St. various locations including: 20) Mass. Ave. & Schouler Ct./Lockeland Ave Street Lights/fixtures 21) Mass. Ave. & Thorndike Ave./Teele St. Pedestrian Lamp Posts/fixtures 22) Medford St. & Warren St. Bollard Lights 23) Mystic St. & Chestnut St. Floodlights 24) Mystic St. & Columbia Rd./Kimball Rd. Parking Lot Lighting (Town Owned Only) 25) Park Ave. & Florence Ave. 26) Park Ave. & Park Circle 27) Pleasant St. & Irving St. III PROPOSAL To the Town of Arlington, Massachusetts, herein called the TOWN, acting through its Town Manager; the undersigned, as bidder, declares as follows: a. The only persons or parties interested in this proposal as Principals are named in this proposal; b. This proposal is made without collusion with any other Person, firm or corporation; c. He has carefully examined the requirements of the proposed work; d. This proposal is based solely on his own investigation and research and not in reliance upon any survey, report or representations of any employee, officer or agent of the TOWN; and the undersigned proposes and agrees that if this proposal is accepted, he will contract with the TOWN, this Contract Bid Form being part of and included in said CONTRACT, to provide all necessary supervision, labor, equipment, machinery, tools, apparatus, and other means of service necessary to complete the requirements in the CONTRACT; and that he will take in full payment thereof the following sums to wit: Bidders must bid on each item. All entries in the Contract Bid Form must be made clearly and in ink, and prices must be written in both words and figures in the space provided. Bidders should insert computed totals in the spaces provided therein: IV SCOPE OF WORK The work to be performed shall consist of the installation, maintenance, troubleshooting, programming or repair of traffic signals, traffic control devices and street lights including all appurtenant items for any traffic control equipment device within the Town of Arlington. At a minimum this may include work on structural supports, signal heads, pedestrian signals and call buttons, cabinets, controllers, street lighting and other equipment, pull boxes, conduit, wiring, cables, camera and video detection, vehicle loop detection, electrical service connections, solar related equipment, wireless communications and affixed signs. Work shall include furnishing all labor, equipment, materials, supplies and incidental costs necessary to maintain a functioning traffic control and street light systems. Contract value is limited to $99,000. V GENERAL PROVISIONS 1. Contractor shall not proceed with any work unless directed by the DPW Director, Police Chief and/or designees. 2. During work operations the contractor shall make every effort to avoid interference with the free flow of traffic and when necessary shall be responsible to maintain a safe work zone in accordance with all local ordinances and requirements as well as the current Manual on Uniform Traffic Control Devices including utilizing necessary and suitable signs and traffic control devices. If conditions warrant, the contractor shall be responsible for coordinating police details with the Arlington Police Department when necessary. 3. Police Details shall be provided to the Contractor at the expense of the Department of Public Works if a Police Detail is deemed necessary. The Contractor shall be responsible for all Police Detail scheduling and cancelations. Any fees associated with late cancelations shall be the responsibility of the Contractor. 4. Any required Police Traffic Details shall require contractor to sign-off on detail slip and shall clearly indicate location of work performed on time slip. 5. All work shall be performed in a responsible and timely manner in compliance with all pertinent local, state and federal requirements and in accordance with the Commonwealth of Massachusetts Highway Department 1995 Standard Specifications for Highways and Bridges, Institute of Transportation Engineers, International Municipal Signal Association, and the Manual of Uniform Traffic Control Devices Specifications (MUTCD) as amended in addition to; a. Massachusetts Department of Transportation Traffic Engineering Policies and Design Guidelines, and; b. the current Town of Arlington Street Occupancy and Trench Permit Regulations; c. All accessibility requirements detailed in the current Americans with Disabilities Act (ADA) and Massachusetts Architectural Access Board (MAAB) requirements as stated in Massachusetts General Law. 6. The work will vary in quantity and location. 7. The Contractor shall maintain an adequate inventory of parts, supplies, controllers, mast arms, etc. and adequate skilled help so that no undue delay is caused in the repair, service and operation of traffic signals or units covered by this contract. 8. The Contractor’s vehicles shall be clearly marked with the name of the company.

See more

The list of books you might like

Most books are stored in the elastic cloud where traffic is expensive. For this reason, we have a limit on daily download.