Major Projects & EIR Section City Hall • 200 N. Spring Street, Room 750 • Los Angeles, CA 90012 I S NITIAL TUDY HOLLYWOOD COMMUNITY PLAN AREA 1375 St. Andrews Apartments Project Case No. ENV-2015-4630-EIR ZA-2015-4629-ZAA-ZAI-SPR Council District No. 13 Project Address: 1365–1375 St. Andrews Place, 5604-32 W De Longpre Avenue, and 5605-5607 W. Fernwood Avenue, Los Angeles, CA 90028 Project Description: The project proposes the demolition of 35,057 square feet of existing buildings on the site, consisting of a two- story commercial structure occupied by Citizens of the World Silver Lake charter school and a single-story vacant commercial structure. The project includes the construction of a new seven-story, 192,273 square-foot residential building with 185 residential units above a 1 ½ level subterranean parking garage, with a total of 251 on-site parking spaces. The project proposes a maximum height of 85 feet. The first level would consist of the residential lobby and parking, the second level would consist of residential units and parking, and the third through seventh level would consist of residential units. The project would include public and private open space including a fitness facility, community rooms, two courtyards, park, park area, rear yard, and pool. Once complete, the project would total approximately 201,954 square feet, including the existing theater. The existing theater building located on the project site at 5605–5607 Fernwood Avenue/1365 St. Andrews Place and operated by Assistance League of Los Angeles would be maintained on the site and continue operations as part of the project. The project would require various approvals, and the Project Applicant is requesting Site Plan Review; Zoning Administrator’s Adjustment to allow a non-conforming front yard of 0 feet and non- conforming side yard of 7 feet for the existing building to remain; Zoning Administrator’s Interpretation to determine that St. Andrews Place shall be the front yard, De Longpre Avenue and Fernwood Avenue shall be the side yards, and the western property line separating Lots 7 and 8 shall be the rear yard; and other required ministerial and discretionary building permits. APPLICANT: 1375 St. Andrews LLC PREPARED BY: EcoTierra Consulting, Inc. May 2016 TABLE OF CONTENTS Page I. INTRODUCTION ......................................................................................................................... I‐1 II. PROJECT DESCRIPTION ............................................................................................................ II‐1 III. INITIAL STUDY CHECKLIST ..................................................................................................... III‐1 IV. ENVIRONMENTAL IMPACT ANALYSIS ................................................................................... IV‐1 1. Aesthetics ................................................................................................................ IV‐1 2. Agriculture and Forestry Resources ........................................................................ IV‐4 3. Air Quality ............................................................................................................... IV‐7 4. Biological Resources .............................................................................................. IV‐10 5. Cultural Resources ................................................................................................ IV‐13 6. Geology and Soils .................................................................................................. IV‐15 7. Greenhouse Gas Emissions ................................................................................... IV‐19 8. Hazards and Hazardous Materials ........................................................................ IV‐21 9. Hydrology and Water Quality ............................................................................... IV‐24 10. Land Use and Planning .......................................................................................... IV‐31 11. Mineral Resources ................................................................................................ IV‐33 12. Noise ..................................................................................................................... IV‐34 13. Population and Housing ........................................................................................ IV‐37 14. Public Services ....................................................................................................... IV‐38 15. Recreation ............................................................................................................. IV‐41 16. Transportation and Traffic .................................................................................... IV‐41 17. Utilities and Service Systems ................................................................................ IV‐43 18. Mandatory Findings of Significance ...................................................................... IV‐48 V. PREPARERS .............................................................................................................................. V‐1 VI. ACRONYMS AND ABBREVIATIONS ........................................................................................ VI‐1 1375 St. Andrews Apartments Project Table of Contents Initial Study Page i City of Los Angeles April 2016 PRELIMINARY WORKING DRAFT List of Figures Page Figure II‐1: Regional Vicinity and Project Location ...................................................................... II‐3 Figure II‐2: Aerial View of the Project Site and Vicinity ............................................................... II‐4 Figure II‐3: Photos of Surrounding Land Uses, Views 1, 2, and 3 ................................................ II‐5 Figure II‐4: Photos of Surrounding Land Uses, Views 4, 5, and 6 ................................................ II‐6 Figure II‐5: Photos of Existing Land Uses, Views 7, 8, and 9 ........................................................ II‐7 Figure II‐6: Photos of Existing Land Uses, Views 10, 11, and 12 .................................................. II‐8 Figure II‐7: Conceptual Site Plan ................................................................................................ II‐12 Figure II‐8: Basement Conceptual Plan ...................................................................................... II‐13 Figure II‐9: First Floor Conceptual Site Plan ............................................................................... II‐14 Figure II‐10: Second Floor Conceptual Site Plan ........................................................................ II‐15 Figure II‐11: Third Floor Conceptual Site Plan ........................................................................... II‐16 Figure II‐12: Fourth Floor Conceptual Site Plan ......................................................................... II‐17 Figure II‐13: Fifth Floor Conceptual Site Plan ............................................................................ II‐18 Figure II‐14: Sixth Floor Conceptual Site Plan ............................................................................ II‐19 Figure II‐15: Seventh Floor Conceptual Site Plan ....................................................................... II‐20 Figure II‐16: Landscaping Plan ................................................................................................... II‐21 Figure II‐17: Residential Building Perspective ........................................................................... II‐22 Figure II‐18: Residential Building Elevations .............................................................................. II‐23 Figure II‐19: Residential Building Cross‐Sections ....................................................................... II‐24 List of Tables Page Table II‐1: Existing Land Uses ....................................................................................................... II‐9 Table II‐2: Project Development Summary ................................................................................ II‐10 1375 St. Andrews Apartments Project Table of Contents Initial Study Page ii I. INTRODUCTION The subject of this Initial Study is the proposed 1375 St. Andrews Apartments Project. The project proposes the demolition of 35,057 square feet of existing buildings on the site, consisting of a two‐story commercial structure occupied by Citizens of the World Silver Lake charter school and a single‐story vacant commercial structure. The project includes the construction of a new seven‐story, 192,273 square‐foot residential building with 185 residential units above a 1 ½ level subterranean parking garage, with a total of 251 on‐site parking spaces. The project proposes a maximum height of 85 feet. The first level would consist of the residential lobby and parking, the second level would consist of residential units and parking, and the third through seventh level would consist of residential units. The project would include public and private open space including a fitness facility, community rooms, two courtyards, park, park area, rear yard, and pool. Once complete, the project would total approximately 201,954 square feet, including the existing theater. The existing theater building located on the project site at 5605–5607 Fernwood Avenue/1365 St. Andrews Place and operated by Assistance League of Los Angeles would be maintained on the site and continue operations as part of the project. The project is located within the Hollywood Community Plan Area of the City of Los Angeles. The City of Los Angeles Department of City Planning is the Lead Agency under the California Environmental Quality Act (CEQA). PROJECT INFORMATION Project Title: 1375 St. Andrews Apartments Project Project Location: 1365–1375 St. Andrews Place, 5604‐5632 W. De Longpre Avenue, and 5605‐5607 W. Fernwood Avenue Los Angeles, CA 90028 Project Applicant: 1375 St. Andrews LLC 1590 Rosecrans Avenue, Suite #D‐303 Manhattan Beach, CA 90266 Lead Agency: City of Los Angeles Department of City Planning 200 N. Spring St., Room 750 Los Angeles, CA 90012 ORGANIZATION OF INITIAL STUDY This Initial Study is organized into four primary sections as follows: Introduction: This section provides introductory information such as the project title, the project applicant and the lead agency for the project. 1375 St. Andrews Apartments Project I. Introduction Initial Study Page I‐1 City of Los Angeles May 2016 PRELIMINARY WORKING DRAFT Project Description: This section provides a description of the environmental setting and the project, including project characteristics and environmental review requirements. Initial Study Checklist: This section contains the completed City of Los Angeles Initial Study Checklist. Environmental Impact Analysis: Each environmental issue identified in the Initial Study Checklist contains an assessment and discussion of impacts associated with each subject area. When the evaluation identifies potentially significant effects, as identified in the Initial Study Checklist, mitigation measures are provided to reduce such impacts to less than significant levels. 1375 St. Andrews Apartments Project I. Introduction Initial Study Page I‐2 II. PROJECT DESCRIPTION 1. PROJECT APPLICANT The Applicant for the 1375 St. Andrews Apartments Project (the “project”) is 1375 St. Andrews LLC (the “Applicant”). The project is located at 1365–1375 St. Andrews Place, 5604‐3562 W. De Longpre Avenue, and W. 5605‐5607 Fernwood Avenue in Hollywood, 90028 (the “project site”). 2. PROJECT LOCATION A. Project Site The project site consists of an L shaped lot comprising approximately 1.7 acres at the southwest corner of the intersection of St. Andrews Place and W. De Longpre Avenue in Hollywood. The project site fronts approximately 330 feet along the west side of St. Andrews Place, 350 feet along the south side of De Longpre Avenue, and 100 feet along the north side of Fernwood Avenue (see Figure II‐1, Regional Vicinity and Project Location). The project site is composed of two parcels, seven legal lots along De Longpre Avenue and to two legal lots fronting on Fernwood Avenue. The nine (9) parcels are legally described as Lots 1 through 7, 29, and 30, Block 3, of the Lemona Tract and include Assessor Parcel Numbers 554‐403‐0052 and 554‐403‐0059. The project site is relatively flat and is currently occupied by a charter school with a pool and concrete sports areas, a vacant building and asphalt play areas formerly used as a child care center, and an operating theater (see Figure II‐2, Aerial View of Project Site and Vicinity). These existing buildings total approximately 44,738 square feet of floor area. B. Surrounding Land Uses The land uses proximate to the project site are characterized by a mix of low‐ to high‐intensity commercial, institutional, and residential uses, which vary widely in building style and period of construction. Nearby vicinity land uses include the Hollywood Freeway (US‐101) to the west, a Home Depot to the north, a partially completed Target building to the northeast, buildings that previously housed the Assistance League of Los Angeles and are now vacant to the east, and multi‐family residential development to the south. Surface parking for the Home Depot is located directly north of the project site, across De Longpre Avenue. The partially completed Target is located directly northeast of the project site at the intersection of De Longpre Avenue and St. Andrews Place. Two‐story buildings that previously housed the Assistance League of Los Angeles are located to the east, across St. Andrews Place. Two multi‐family residential buildings and a single‐family residence are located directly south of the project site, across Fernwood Avenue. A surface parking lot used by the Children’s Theater is located on the southeast corner of the intersection of St. Andrews Place and Fernwood Avenue. Figures II‐3 and II‐4, Photos of Surrounding Land Uses, show key surrounding land uses in the general vicinity of the project site. The general area surrounding the project site is relatively flat and is developed with a variety of commercial land uses, including retail and hotel uses along Sunset Boulevard, with surface parking areas and structures. The western edge of the project site is located approximately 90 feet from US‐101. The project site is located to the southeast of the KTLA Studios and Helen Bernstein High School along Sunset Boulevard. 1375 St. Andrews Apartments Project II. Project Description Initial Study Page II‐1 City of Los Angeles May 2016 PRELIMINARY WORKING DRAFT Los Angeles County Metropolitan Transportation Authority (“Metro”) buses run along Sunset Boulevard and Western Avenue. The project is well served by nearby transit including the Metro Red Line (Hollywood/Western Station), Hollywood Dash Lines 2/302, Metro Rapid Lines 757 and 780, and Metro Local Lines 207, 217, 206, 180, and 181.1 The nearest Metro rail line station (Hollywood/Western) is located at Hollywood Boulevard and Western Avenue, which is approximately one‐half mile northeast of the project site. Commercial amenities in the project area include the nearby Home Depot, coffee shops, restaurants, and retail uses along Sunset Boulevard, a grocery store along De Longpre Avenue west of Western Avenue. C. Land Use Plans and Zoning The project site is located in the Hollywood Community Plan Area, the Hollywood Redevelopment Project Area, and is zoned as R4‐2 (Multiple Dwelling Zone‐Unlimited Height District). The zone permits a 6:1 Floor Area Ratio (FAR). However, the FAR on the project site is limited to a maximum of 4.5:1 by the Hollywood Community Plan. The project site is designated as High Density Residential in the Hollywood Community Plan. The project is located within a Los Angeles State Enterprise Zone. The project site is located near, but not within, the Vermont‐Western Transit Oriented District Station Neighborhood Area Plan (SNAP). The project site is located within a City of Los Angeles Transit Priority Area (TPA). 3. EXISTING LAND USES The project site is currently developed with a two story commercial structure leased to the charter school Citizens of the World Silver Lake (CWSL), a vacant single‐story commercial structure, and a children’s playhouse/theater building operated under a long‐term lease by Assistance League of Los Angeles. The children’s playhouse/theater building would be retained as part of the project. CWSL plans to vacate the premises at the close of the 2015/2016 school year, and will be relocating to another facility for the 2016/2017 school year. Once the CWSL relocates, the building will be vacant and remain vacant until commencement of the project. Existing land uses within the project site include three buildings totaling approximately 44,738 square feet of floor area, a pool, and concrete and asphalt outdoor areas. There are eight (8) lemon and other unprotected tree types on the project site. The existing land uses are summarized in Table II‐1, Existing Land Uses. Photos of the existing land uses on the project site are presented in Figures II‐5 and II‐6, Photos of Existing Land Uses. 1 Metro Bus and Rail System Map, accessed at http://media.metro.net/riding_metro/maps/images/system_map.pdf. 1375 St. Andrews Apartments Project II. Project Description Initial Study Page II‐2 PROJECT SITE Project Site 0 400 Source: GoogleEarth, February 2016. Scale (Feet) Figure II-1 Regional Vicinity and Project Location Project Site 0 200 Source: Google Earth, February 2016. Scale (Feet) Figure II-2 Aerial View of the Project Site and Vicinity Y 82 2 F E 0 O 0 7 8 V 92 R AE G$ IG N U A DE LONGPRE AVENUE RP 12 S O F | S C LI SUBJECT 13 T. A I CA015 PROPERTY ND H , 2 RE P ES1, W L2 S 11 A ER P GE L R NB A Y 8 2 15 CE 10 G AEM 1! VE90021 OF 14 O LOSEC 6! 5! 4! 3! 2! G$ DE LONGPRE AVENUE G$ G$ URNIA AGE FERNWOOD AVENUE 9 OT UE, D PSRUOBPDJEEE RLCOTTNYG P RE AVST. ANDREWS PLACENUE PSRUOBPJEERCTTY ST. ANDREWS PLACE DE LONGPRE AVENUGE $ SUBJECT !"##$%!RAPHIC S$&&$$'*:ANGELES, CALIFOR(;)MBER 21, 2015 | P.$8!"9"(#4$$*/*2$8"H2:$23$#D292$ 7 8 7 9 <<.(=-5:-1($2R2$&;$$>,.0((1:$52(3$P($3S".48H.::==$:$92D-(9"D91-(($4929$$-(A".:$":;$4259D1(849(- /)$";7"8(URVEY :9$#-2RNIA 90028 #(-9PAGE 2 OF 2 1)$03-2A $ <:.2=-59-D(($I"$4&9$$>.(1$23$(S.4H:=$9D("9-($92$-(A".:$3-2A$<(-:122;$,0(:5(P$3"8.:=$11 ITE PH ONGPRE AVEN E 12 PROPERTY GS CE S O S L OOE F | FERNWOOD AVENUE SUBJECT 13 ST. A OTNUE, LD IC CALI 015 W. DE !"#$%$&$'()$!"#$*$ #! &$*:;.8"9(4$/28"H2:$23$#D292$ !"#$+$&$,(-."/$0.(1$23$4567(89$#-2P#(-R9)$O":F;EP$R(N:EW0.-OR2O:4DT$ AYVE NUE NDREWS !"1#1$E $&$MN.-;4()(O$0.(1$23$?567(89$@-2#(-9)$":;$(:0.-2:4P$3"8.:=$4259D$ E PHPRE AVE APH ELES, R 21, 2 5632 P TG G E – 1 15 14 LACE 210 3 SIE LON GR S AN EMB 604 D O C 5 O E W. L FERNWOOD AVENUE 9 D 2 T E, 3 6 O U #! &$*:;.8"9(4$/28"H2:$23$#D292$ 8 7 5 N <.=5-($R$&$>.(1$23$(S.4H:=$9D("9-($92$-(A".:$":;$4259D –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– 4 0 6 5 <.=5-($K$&$>.(1$23$?567(89$@-2#(-9)$3-2A$B($C2:=#-($,0(:5($3"8.:=$4259D1(49$ <.=5-($F$&$>.(1$23$?567(89$@-2#(-9)$3-2A$B($C2:=#-($,0(:5($3"8.:=$4259D1(49$ P<.h=5o-(t$oL$ &$1>.:( 1V$2i3e$1w(4 9o(-f/ )$w";e7"s8(t:e9r$#ly-2 #a(-d9)ja$3"c8e.:n=$t4 25p9rDo("p4e9$rty facing P<.h=5o-t(o$ %2+:$& V$>ie.(w1 $o2f3 $p#-ro2#p(e-r9t)y$ :n2o-r9tDh$2 o3$f? 5th6e7( p89r$o@j-e2c#t( s-9it)e$2 o:n$B ($ <.=5-($%E$&$>.(1$23$#-2#(-H(4$("49$23$?567(89$@-2#(-9)$2:$ <.=5-($%K$&$>.(1$23$#-2#(-9)$4259D("49$23$?567(89$ <.=5-($%F$&$>.(1$23$#-2#(-9)$4259D$23$?567(89$@-2#(-9)$2:$ southeast. DC2e: L=#o-n(g$,p0r(e: A5v(e$ nue. ?9Q$,:;-(14$@/"8($ @-2#(-9)$":;$?9Q$,:;-(14$@/"8($":;$<(-:122;$,0(:5($ <(-:122;$,0(:5($ %IJE$ F$ <.=5-($T$&$>.(1$23$(S.4H:=$9D("9-($92$-(A".:$3-2A$?9Q$,:;-(14$@/"8(P$3"8.:=$1(49$ <.=5-($%J$&$>.(1$23$(S.4H:=$9D("9-($92$-(A".:$3-2A$?9Q$,:;-(14$@/"8(P$3"8.:=$1(49$ <.=5-($%%$&$>.(1$23$?567(89$@-2#(-9)$92$-(A".:$3-2A$?9Q$,:;-(14$@/P$3"8.:=$1(49$ E C A 12 13 PL 14 15 S 1 W E DE LONGPRE AVENUE R D N 2 A T. S 3 FERNWOOD AVENUE U S - 1 <.=5-($%+$&$>.(1$23$#-2#(-9)$:2-9D$23$?567(89$@-2#(-9)$2:$B($ P<h.o=5to-( 3$%: EV$i&e$w>. (o1f t$h2e3 $p#r-o2p#e(r-tHie(s4 $e(a"s4t9 $o2f3 t$h?5e 6p7r(o8j9e$c@t- 2si#te( -9)$2:$ <.=5-($%K$0&$>.(1$23$#-2#(-9)$4259D("49$23$?567(89$ <.=5-($%F$&$>.(1$23$#-2#(-9)$4259D$23$?567(89$@-2#(-9)$2:$ 1 C2:=#-($,0(:5($ o?n9 SQ$,t. :A;n-d(r1ew4$s@ /P"8la(c$e. @-2#(-9)$":;$?9Q$,:;-(14$@/"8($":;$<(-:122;$,0(:5($ <(-:122;$,0(:5($ PROJECT SITE PHOTO LOCATION MAP Source: EcoTierra and three6ixty, February 2016. Figure II-3 Photos of Surrounding Land Uses Views 1, 2, and 3
Description: